Daikin EVLQ08CAV3 [116/252] To perform an air purge on the gas supply
7 | Installation
Installer reference guide
116
EVLQ05+08CAV3 + EHYHBH05AF + EHYHBH/X08AF + EHYKOMB33AA
Daikin Altherma hybrid heat pump
4P355634-1F – 2020.10
1 Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
cd
a Gas pipe
b Gas pipe insulation
c Interconnection cable
d Field wiring (if applicable)
e Liquid pipe
f Liquid pipe insulation
g Finishing tape
2 Install the service cover.
7.14.2 To close the outdoor unit
1 Close the switch box cover.
2 Close the service cover.
NOTICE
When closing the outdoor unit cover, make sure that the tightening torque does NOT
exceed 4.1N•m.
7.15 Finishing the indoor unit installation
7.15.1 To close the indoor unit
1 Close the switch box.
2 Mount the side plate to the unit.
3 Mount the top plate.
NOTICE
When closing the indoor unit cover, make sure that the tightening torque does NOT
exceed 4.1N•m.
Before doing the configuration of the heat pump module, make sure that the
hybrid module and gas boiler are installed correctly.
7.16 Finishing the gas boiler installation
7.16.1 To perform an air purge on the gas supply
1 Turn once the screw counterclockwise.