3 RECEIVING THE PRODUCT AND STORAGE
3.1 Reception
On receiving the unit, check that it is undamaged, bearing in mind that it left the factory in perfect condition.
Report any signs of damage immediately to the transporter and make a note of these on the Delivery Sheet before
signing it.
The relevant sales department or the manufacturer should be informed of the extent of the damage as soon as
possible.
TheCustomermustdrawupawrittenandphotographicreportconcerninganyandallsignicantdamage.
Disposal of the packing material is the responsibility of the consignee and must be carried out in compliance with the
regulations in force in the country in which it is carried out.
3.2 Transport
The unit is sent from the warehouse using suitable vehicles, with correct clamping in order to prevent any possibility
of movement whilst in transit by road that may damage it or cause accidents.
If there is to be trans-shipment to other vehicles to continue the journey, it is essential to adopt all necessary measures
for ensuring the correct safety conditions, with regard to the vehicles used and the anchorage, in order to prevent
damage.
If the unit is to be transported over uneven roads, the manufacturer must be informed beforehand so that suitable
measures can be taken in order to prevent damage to the unit.
If it is to be transported by container, make sure it is correctly anchored.
3.3 Handling
Before each unit handling operation, check that the lifting capacity of the machinery used is compatible with the
weight of the unit.
Handlingmustbecarriedoutbyadequatelyequippedqualiedpersonnel.
Inallliftingoperations,makesuretheunitisrmlysecuredinordertopreventaccidentalfallsor
overturning.
Liftingmustbecarriedoutbyqualiedandauthorisedpersonneltakingthenecessaryprecautions;if
carried out incorrectly, lifting can cause serious damage and physical injury.
The handling operations must be carried out slowly and sudden manoeuvres and knocks must be
avoided.
Donot,underanycircumstances,standorpassunderorneartheunitwhenitisliftedotheground.
Use only the lifting system designed and prepared for the unit.
During unloading and positioning of the unit, great care must be taken to prevent sudden or violent manoeuvres, and
the components of the unit must not be used as lifting points.
Make sure the machinery and lifting ropes are of suitable size and capacity and strictly follow their operating
instructions.Useonlyequipmentthatisinexcellentworkingorder.
All work on the unit, including unpacking and connections, must be carried out with the unit resting on the ground.
Refer, in any case, to the lifting instructions provided with the unit.
Содержание
- Installation use and maintenance manual 1
- Models 1
- Rooftop packaged unit 1
- Rooftop packaged unit english 1
- Contents 3
- Installation 22 3
- Introduction 6 3
- Product description 16 3
- Receiving the product and storage 13 3
- Safety 8 3
- Commissioning 30 4
- Decommissioning 41 4
- Maintenance 36 4
- Conformity 6
- Description 6
- Introduction 6
- Symbols 6
- Labels 7
- General safety precautions 8
- Safety 8
- Discharge of the safety valves 9
- Basic rules 10
- Noise levels 11
- Residual risks 11
- Hazards and health consequences 12
- Safetyinformationontherefrigerantfluid 12
- Handling 13
- Receiving the product and storage 13
- Reception 13
- Transport 13
- Storage 15
- Intended use 16
- Product description 16
- Unintended use 16
- Control and safety devices 17
- Principles of operation 17
- Specifications 17
- Structure 17
- Air system 18
- Airflowsensor 18
- Flow rate sensor for fans 18
- Internal air fans 18
- Airfiltersg4 19
- Dirtyfiltersensor 19
- Programmable control 20
- Wiring diagram 21
- Dimensions and weight 22
- Installation 22
- Installation site 22
- Fitting of rain hoods 23
- Installation 23
- Anti vibration mounts 24
- External positioning 24
- Minimum distances 25
- Electrical connections 26
- Condensate drain connections 28
- Condensate drain of the external air coil 28
- Condensate drain of the internal air coil 28
- Aeraulic connections 29
- Connection of the ducts 29
- Return and supply ducts 29
- Commissioning 30
- Preliminary operations 30
- First starting 31
- Functional tests 31
- Preliminary checks 31
- Calibration of safety components 32
- Control and safety components unit activation set 32
- Point differential reset 32
- Checks during operation 33
- Alarms and malfunctions 34
- Symptom likely cause possible solution 34
- Stop for long periods of time 35
- Temporary stop 35
- Adjustments 36
- Maintenance 36
- Cleaning the coils 37
- External cleaning 37
- Cleaning the unit 38
- Internal cleaning 38
- Periodic checks 39
- Exceptional work 40
- Special work 40
- Unscheduled maintenance 40
- Decommissioning 41
- P522680 44
- Um_dkn_0001_rooftop_en_12 09 2018_rev02 44
Похожие устройства
- Daikin UATYQ50ABAY1 Инструкция по эксплуатации
- Daikin UATYQ50ABAY1 Инструкция по монтажу
- Daikin UATYQ55ABAY1 Инструкция по эксплуатации
- Daikin UATYQ55ABAY1 Инструкция по монтажу
- Daikin UATYQ65ABAY1 Инструкция по эксплуатации
- Daikin UATYQ65ABAY1 Инструкция по монтажу
- Daikin UATYQ75ABAY1 Инструкция по эксплуатации
- Daikin UATYQ75ABAY1 Инструкция по монтажу
- Daikin UATYQ90ABAY1 Инструкция по эксплуатации
- Daikin UATYQ90ABAY1 Инструкция по монтажу
- Apeyron Electrics 03-58 Инструкция по эксплуатации
- Daikin UATYQ100ABAY1 Инструкция по эксплуатации
- Daikin UATYQ100ABAY1 Инструкция по монтажу
- Daikin UATYQ115ABAY1 Инструкция по эксплуатации
- Daikin UATYQ115ABAY1 Инструкция по монтажу
- Daikin UATYQ20AFC2Y1 Инструкция по эксплуатации
- Daikin UATYQ20AFC2Y1 Инструкция по монтажу
- Apeyron Electrics 03-59 Инструкция по эксплуатации
- Daikin UATYQ25AFC2Y1 Инструкция по эксплуатации
- Daikin UATYQ25AFC2Y1 Инструкция по монтажу