6 COMMISSIONING
6.1 Preliminary operations
Theunitshouldonlybestartedupbyqualiedpersonnelauthorisedbythemanufacturer.
All the units are pre-charged with refrigerant gas, so the refrigerant circuit is pressurised.
Check:
- that the electrical connection has been made correctly and that all terminals are properly tightened;
- thatthevoltageontheRSTterminalsis400V±10%(ortheratedvoltageoftheunitiftherearespecialvoltages);
- thatthegaspressureintherefrigerantcircuitsisshownonthepressuregauges(ifpresent)oronthecontrol
display;
- thattherearenorefrigerantuidleaks,usingaleakdetectorifnecessary(thepresenceofoilstainsmaybea
sign of refrigerant leaks).
Be careful with the electrical checks and use only suitable tools.
Position the master switch of the unit to ON and check on the display of the control that the unit is OFF in order to
prevent it from starting.
Check that the heaters for heating the oil in the compressor crankcases are powered correctly.
The crankcase heaters are powered when the main disconnect switch is closed and this must be done
at least 12 hours before starting the unit.
To check that the heaters are working correctly, check that the lower part of the compressors is hot and in any case
atatemperatureof10-15°Cabovetheexternaltemperature.
Check:
- that any sensors supplied with the unit are installed correctly according to the wiring diagram and the relevant
documentation;
- that the remote control, if any, is connected as shown in the wiring diagram and that it is working correctly;
- that the connection to the aeraulic system has been made correctly, via the air supply and return channels;
- that a suitable syphon has been made on the condensate drain.
Before starting the unit, check that all the closing panels of the unit are in place and secured with
xingscrews.
Содержание
- Installation use and maintenance manual 1
- Models 1
- Rooftop packaged unit 1
- Rooftop packaged unit english 1
- Contents 3
- Installation 22 3
- Introduction 6 3
- Product description 16 3
- Receiving the product and storage 13 3
- Safety 8 3
- Commissioning 30 4
- Decommissioning 41 4
- Maintenance 36 4
- Conformity 6
- Description 6
- Introduction 6
- Symbols 6
- Labels 7
- General safety precautions 8
- Safety 8
- Discharge of the safety valves 9
- Basic rules 10
- Noise levels 11
- Residual risks 11
- Hazards and health consequences 12
- Safetyinformationontherefrigerantfluid 12
- Handling 13
- Receiving the product and storage 13
- Reception 13
- Transport 13
- Storage 15
- Intended use 16
- Product description 16
- Unintended use 16
- Control and safety devices 17
- Principles of operation 17
- Specifications 17
- Structure 17
- Air system 18
- Airflowsensor 18
- Flow rate sensor for fans 18
- Internal air fans 18
- Airfiltersg4 19
- Dirtyfiltersensor 19
- Programmable control 20
- Wiring diagram 21
- Dimensions and weight 22
- Installation 22
- Installation site 22
- Fitting of rain hoods 23
- Installation 23
- Anti vibration mounts 24
- External positioning 24
- Minimum distances 25
- Electrical connections 26
- Condensate drain connections 28
- Condensate drain of the external air coil 28
- Condensate drain of the internal air coil 28
- Aeraulic connections 29
- Connection of the ducts 29
- Return and supply ducts 29
- Commissioning 30
- Preliminary operations 30
- First starting 31
- Functional tests 31
- Preliminary checks 31
- Calibration of safety components 32
- Control and safety components unit activation set 32
- Point differential reset 32
- Checks during operation 33
- Alarms and malfunctions 34
- Symptom likely cause possible solution 34
- Stop for long periods of time 35
- Temporary stop 35
- Adjustments 36
- Maintenance 36
- Cleaning the coils 37
- External cleaning 37
- Cleaning the unit 38
- Internal cleaning 38
- Periodic checks 39
- Exceptional work 40
- Special work 40
- Unscheduled maintenance 40
- Decommissioning 41
- P522680 44
- Um_dkn_0001_rooftop_en_12 09 2018_rev02 44
Похожие устройства
- Daikin UATYQ50ABAY1 Инструкция по эксплуатации
- Daikin UATYQ50ABAY1 Инструкция по монтажу
- Daikin UATYQ55ABAY1 Инструкция по эксплуатации
- Daikin UATYQ55ABAY1 Инструкция по монтажу
- Daikin UATYQ65ABAY1 Инструкция по эксплуатации
- Daikin UATYQ65ABAY1 Инструкция по монтажу
- Daikin UATYQ75ABAY1 Инструкция по эксплуатации
- Daikin UATYQ75ABAY1 Инструкция по монтажу
- Daikin UATYQ90ABAY1 Инструкция по эксплуатации
- Daikin UATYQ90ABAY1 Инструкция по монтажу
- Apeyron Electrics 03-58 Инструкция по эксплуатации
- Daikin UATYQ100ABAY1 Инструкция по эксплуатации
- Daikin UATYQ100ABAY1 Инструкция по монтажу
- Daikin UATYQ115ABAY1 Инструкция по эксплуатации
- Daikin UATYQ115ABAY1 Инструкция по монтажу
- Daikin UATYQ20AFC2Y1 Инструкция по эксплуатации
- Daikin UATYQ20AFC2Y1 Инструкция по монтажу
- Apeyron Electrics 03-59 Инструкция по эксплуатации
- Daikin UATYQ25AFC2Y1 Инструкция по эксплуатации
- Daikin UATYQ25AFC2Y1 Инструкция по монтажу