Daikin GCU2020PXB1 [12/177] Both k65

Daikin GCU2020PXB1 [12/177] Both k65
9.
Installation spacing
Below picture shows the recommended spacing aroung the unit for operational, service and maintainence
purposes. Respect minimum spacing from walls as showing below.
ATTENTION
Before connecting the unit make sure that mains voltage and frequency correspond to
the values shown in the data plate. Voltage tolerance: +/- 10% compared to nominal
value.
10.
External Pipe and Electrical connections
Liquid and Suction Line positions are shown as below. Both liquid and suction line are sealed to avoid any moister
entering the pipes. The unit is delivered with positive pressure, please make sure that you release pressure before
cutting the pipes.
Pipe Sizes:
GCU4070PXB1 :
Suction Line: 1/2’’ Liquid Line: 1/2’’
Both K65
Mains electrical supply should be connected by drilling the cover plate as shown below. Secure main cable and
avoid scratches on mains cable. Fit M20 gland is recommended.
Page 12 of 177
Copyright HPL January 2021
P4115S Rev 02

Содержание

Скачать