8. Commissioning, Operation and Maintenance
8.1 Unit commissioning
The steps of:
1) The wired remote operating power, if found fault code display unit, rst eliminate the fault, conrm trouble-free
unit, And then start the unit.
2) Test run for 30 minutes, out of the water temperature is stable, adjust the water ow to the nominal value, to
ensure the normal operation of the unit.
3) After the unit is running, running current inspection unit, operating pressure, pressure water system, water ow,
and out of the unit Poor water temperature parameters, and the actual situation on the water ow be adjusted to
ensure that the unit is operating properly.
4) According to the actual weather conditions parameter unit operation, referring to the unit's operating
instructions, optimizing the setting unit Parameters to achieve the best working conditions of the unit.
5) After the shutdown interval of 4 minutes and then put into operation, in order to prevent frequent starting unit.
Note
1) Because the host can start and stop the pump control, when the water system ushing, the pump can not be
controlled by the host Run.
2) Water system is not sufciently unprecedented row, can not open the unit.
3) The ow switch must be installed correctly, or it may occur without water failure.
4) After commissioning the unit shut down intervals of less than four minutes, shall be manually turned on again.
5) In the regular season operation after stopping the operation of the unit, do not turn off the power, otherwise the
compressor can not get heating, It may cause damage to the compressor.
6) When the compressor is stopped for long periods of operation and cut off the power, remember to re-operate
12 hours before the crew should energize, to Preheating the compressor.
7) Commissioning and maintenance may refer to the project schedule, and prepare documented.
8.2 Operating instructions
Users at every turn, strictly follow the steps specied in the instructions sequentially operations to ensure human,
machine safety. The rst start operation should be conducted under the guidance of the company commissioning
engineers.
1) In accordance with the requirements, connect all of cable (wire), internal inspection cabinet and compressor
terminal is solid, if loose, retighten.
2) The power unit will preheat compressor lubricants for more than 8 hours;
3) Open the terminal equipment and check its functioning properly;
4) Open system circulating pump, check the operation direction, check the water system is normal;
5) Check the expansion tank of water, turn on the system water circulation passage of the exhaust valve, exhaust
air despite the Tao;
6) Before turning the unit must be inside the various manual valves fully open.
7) Make sure the power cord is rmly connected, no phase, out of phase problems.
After completion of the above work, until the water temperature reached the requirements, you can start the
terminal equipment into normal cooling operation.
First, before starting preparations
1. After repeated ushing water system piping sewage, water quality cleanliness conrm compliance with the
requirements, the system again after emptying open water pump, conrm the water ow, the outlet pressure to
meet the requirements.
2. Make sure the pump wiring and phase sequence are correct. Because the pump wiring external wiring, so the
control panel can not phase sequence and phase loss conditions were detected pump, so make sure the wiring
is correct.
3. The air piping system must be completely excluded. After Luke give water pipes and exhaust air from the empty
place, to be almost ruled out air, and then open the pump emptying, with or without air pump operation can
listen to the voice, if it is a burst of buzz, or pump outlet pressure gauge pointer swing violently, then the system
is still air, we need to stop the pump repeatedly ruled out open air. Remember: If a lot of air, not
a long time water.
Содержание
- Contents 2
- Feature 3
- Nomenclature 3
- Product feature 3
- Feature 4
- Easy to installation 6
- Feature 6
- Technical features 6
- Specification 8
- Dimension 10
- Unit mm 10
- Caution 11
- Installation 11
- Symbol precautions 11
- Warning 11
- Installation 12
- Site requirements 12
- Installation 13
- Installation 14
- Diagram of arrangement of multiple chiller units 16
- Installation 16
- Unit height 16
- Water pipe connection and wiring connection 17
- Installation 18
- Warning 18
- Heater 20
- Installation 20
- Caution 21
- Caution 22
- Installation 22
- Installation 24
- Waterway design 24
- Controller operation instruction 26
- Description of controller panel 26
- Description of controller panel 27
- Controller operation instruction 28
- Address set 29
- Auxiliary heater pro pump pro system 29
- Ca0070eand drawing 29
- Discharge comp temp system a 29
- Discharge comp temp system b 29
- Expansion valve system a 29
- Expansion valve system b 29
- Fan pro sys t em b 29
- Flow switch 29
- Main board 29
- Moudbus communication interface 29
- Pressure sensor system a 29
- Terminal interface board 2 terminal interface board 1 29
- Th1 th5 th9 th2 th6 29
- Th3 th7 th4 th8 29
- Wiring diagram 29
- Ca0130eand digram 30
- Main board 30
- Sw401 address set 30
- Wiring diagram 30
- Commissioning operation and maintenance 31
- Operating instructions 31
- Unit commissioning 31
- Unit maintenance 32
- Units antifreeze 34
- Pcb photo and address code setting 35
- Fault code 36
- Trouble shooting 38
- Ambient temperature refer to the above diagram operating range 40
- Chilled water flow within 30 of the rated water flow 40
- Chilled water pressure below 0 mpa 40
- Chilled water quality free from corrosive copper iron dissolved matters of welding materials 40
- Installation site provided with snow protection and ventilation 40
- Item contents 40
- Optimal operating temperature 12 c for cooling 40 c for heating 40
- Phase imbalance voltage difference between two phases of the power supply is less than 2 of the rated voltage 40
- Power supply frequency within 1 of rated frequency 40
- Power supply voltage within 10 of the rated voltage 40
- Relative humidity below 90 40
- Service conditions 40
- The operating range based on gb t 18430 and the rated water flow is obtained from lab if theunit exceeds the maximum operating range it only can run for a short time otherwise the unit may send fault alarm or be damaged 40
- Unit operating range 40
- Unit operating range and service condition 40
- Unit service conditions 40
- Technical parameters 41
Похожие устройства
- Haier AB072MRERA Инструкция по эксплуатации
- Haier AB052MCERA(M) Инструкция по эксплуатации
- Haier HDW15V3S1 Инструкция по эксплуатации
- Haier HDW15V2B2 Инструкция по эксплуатации
- Haier HDW15V2S2 Инструкция по эксплуатации
- Haier HDW13V1S1 Инструкция по эксплуатации
- Theben RAMSES 812 top2 (8120132) Инструкция по эксплуатации
- Theben RAMSES 812 top2 (8120132) Технический паспорт
- Theben RAMSES 832 top2 (8320132) Инструкция по эксплуатации
- Theben RAMSES 832 top2 (8320132) Технический паспорт
- Theben RAMSES 811 top2 (8119132) Инструкция по эксплуатации
- Theben RAMSES 811 top2 (8119132) Технический паспорт
- Theben RAMSES 831 top2 (8319132) Инструкция по эксплуатации
- Theben RAMSES 831 top2 (8319132) Технический паспорт
- Theben theLeda D S AL (1020901) Инструкция по эксплуатации
- Theben theLeda D S AL (1020901) Технический паспорт
- Theben theLeda D SU AL (1020902) Инструкция по эксплуатации
- Theben theLeda D SU AL (1020902) Технический паспорт
- Theben theLeda D U AL (1020903) Инструкция по эксплуатации
- Theben theLeda D U AL (1020903) Технический паспорт
Скачать
Случайные обсуждения