Wagner Steam Force Plus (2404466) [6/12] Preparation

Wagner Steam Force Plus (2404466) [6/12] Preparation
6
SteamForce / SteamForce Plus
EN
Preparation
For multi-layered, painted-over or water-resistant wallpapers
especially, we recommend working on the areas to be stripped using
a wallpaper scorer in a grid pattern.
Operation
Remove ller cap and ll unit with clean water to the MAX level line indicator. Replace
cap (Fig. 1+2).
Screw hose onto threaded outlets of boiler and steamplate, securely by hand.
DO NOT overtighten (Fig. 3+4). Check regularly during use to ensure secure t.
Connect supply cord from unit to power socket-outlet (Fig. 5).
lt can take up to 12 mins (approx.) before steam is produced - depending on ll water
quantity and temperature (Fig. 7).
DO NOT leave unattended and keep children and pets out of the room.
Just before full steam production a small amount of bubbling and water will occur at
the steamplate.
BEWARE of hot water discharge prior to steam emission.
Hold the steamplate at against the wallpaper for approx. 10 seconds - from which
the paper should now easily come away using a wallpaper scraper (Fig. 9).
Some papers may need more steam than others. Operate steamer until water level is
low, then unplug unit and allow to cool for at least 2 minutes (Fig. 11).
CAUTION! WARNING: Hot liquid or steam can burn.
Danger of scalding. Steam may also condense into boiling
droplets. Steam should not be directed towards electrical
appliances. Danger of scalding appears on the cap as either
symbol.
Beware! Hot steam can escape when opening the tank cover
and topping up the unit. Once the work is nished, allow the
unit to cool down completely and empty it. Only put the unit
in storage if it is empty and dry.
CAUTION!
Before loosening the ller cap always allow the unit
to cool down for at least 2 minutes. Risk of scalding!
Heated water can leak from the steamplate during the
heating-up phase. Hot water can drip during overhead
work.

Содержание

Скачать