Installation
High Performance 10-20k UPS
13
PE
OUT_L
OUT_
N
BAT+
BAT-
BYP_
L
IN_L1
IN_L2
IN_L3
IN_N
10KVA
PE OUT_L
OUT_
N
BAT+ BAT-
BYP_
L
IN_L1
IN_L2
IN_L3
IN_N
15/20KVA
Fig 2- 1: Terminal Block Wiring Diagram
NOTICEMake sure that the input and output wires and the input and output terminals are connected
tightly.
6) The protective earth ground wire refers to the wire connection between the equipment which
consumes electric equipment and the ground wire. The wire diameter of protective earth
ground wire should be at least as above mentioned for each model and green wire or green
wire with yellow ribbon wire is used.
7) After having completed the installation, make sure the wiring connection is correct.
8) Please install the output breaker between the output terminal and the load.
9) To connect the load with the UPS, please turn off all the loads first, then perform the
connection and finally turn on the loads one by one.
10) No matter the UPS is connected to the utility power or not, the output of the UPS may have
electricity. The parts inside the unit may still have hazardous voltage after turning off the
UPS. To make the UPS have no output, power off the UPS, and then disconnect the utility