Thermaltake Max4 Active Cooling [5/8] Part ii installation

Thermaltake Max4 Active Cooling [5/8] Part ii installation
Part II
Installation
Remove the 4 screws of
upper part.
Using screw driver
to remove the
fixed-support then
insert it to the HDD
side holes.
Separate the upper part of Max4.
1
2
3
4
Put the
fixed-support
insert the HDD
both side.
fixed-support
2.1 HDD Installation
5 6
PROJECT/ N0012US_Max 4 Active Cooling_
VERSION/ A PAGE/ 1/1
DATE/ 090121
10516
(G)
MARKETING CHECK DESIGN
PRODUCT GM
Peipei
(
125mm
176 mm

Похожие устройства

Скачать