Kranzle Therm 891 E-ST 48 [12/64] Putting into operation

Kranzle Therm 871 E-ST 48 [12/64] Putting into operation
1.
Connecttopowercircuit.Make sure that the main switch is in "OFF" position.
2.
Connectmachinetowatermains(2-8barpre-pressure).Insidediameterofhose
minimum1/2".Thewaterstoragetankfillswithwater.Thefloatvalveshutsthewater
intakeassoonasthetankisfull.
3.
Fastenhigh-pressurehosetoappliance
4.
PushonHPhosetogun.
5.
ScrewtogetherHPhoseandgun
pressure-tightly.
12
Putting into operation
6.
Always check oil level prior to
operation! OpentheHPcleaner.
Donotstartthemachineiftheoillevelisnot
betweenthetwomarkingsontheoil-level
glass.Refillwithoilifnecessary.
Seepage23.
Take care that all screw connections are pressure-tight. A leakage
of gun, high-pressure hose or hose drum has to be repaired at once.
Leakages lead to an increased wear and guarantee is void if
consequential damages occur.

Содержание

Скачать