Honda CB125 CB160 (1972) [28/139] Caution

Содержание

Похожие устройства

22 3 ENGINE II Disassembly and installation of clutch 1 Following Section 2 3 B the AC generator rotor is separated from the left crankcase cover 2 As the starter clutch is installed at the back of the AC generator rotor by using three 6 X 20 pan screws it can be separated by removing the screws 3 When installation is being performed attention should be directed to the following points Smooth roller operation STARTING CLUTCH ROLLER SPRING CAP Starter clutch side plate and guide Weak clutch roller spring replace Fig 3 48 Setting operation of starter clutch roller spring III Disassembly and installation of starter sprocket 1 After separation of the AC generator and the left crankcase following the previous section the starting chain is disconnected at the joint section 2 By removing the starting sprocket set plate 6 X 12 screws coupled in the lower crankcase the sprocket can be separated from the crankshaft Refer to Fig 3 49 Fig 3 49 Removing the starting sprocket set plate 3 The starting motor sprocket is coupled only by serration and can be extracted quite easily Refer to Fig 3 50 CAUTION The joint clip slot of the starting chain should face opposite the direction of rotation Fig 3 50 Starting motor sprocket D Clutch adjuster and neutral switch rotor I Operation of clutch adjuster For transmitting operation of the clutch cable to the clutch through the clutch rod the clutch adjuster pushes the clutch rod and indicates relationship in direct start transmission gear shifting and stop That is adjustment of the clutch is generally made at the clutch adjuster adjustment affects the vehicle perfor mance Refer to Fig 3 51 Fig 3 51 Clutch adjuster

Скачать