Honda CB125 CB160 (1972) [59/139] Iv frame

Содержание

Похожие устройства

53 IV FRAME 4 1 Handlebar A Construction of handlebar The complete handlebar is made of pipe and is Fig 4 1 Turning the handlebar installed on the front fork top bridge by the pipe holder The fork top bridge is mounted on the front cushion by two front fork bolts In edition every wire unit is exposed for making handlebar replacement easy Refer to Fig 4 1 B Disassembly 10X14 DOUBLE OPEN END SPANNER 1 Tools required for disassembly and assembly of the handlebar Refer to Fig 4 2 Fig 4 2 Tools required for disassembly and assembly 2 For disassembling the front brake cable turn the front brake arm counterclockwise where the brake is effective and remove the end of the cable Refer to Fig 4 3 3 For disassembling the clutch cable loosen the three small cross point screws of the drive chain Fig 4 3 Removing brake cable cover and remove the end of the cable from the clutch adjustment thread 4 For disassembling the throttle cable loosen and remove the carburetor cap the throttle valve can be pulled out Remove the cable end from the throttle valve Refer to Fig 4 4 Fig 4 4 Removing cable end from the throttle valve

Скачать