3. Reinsert the two screws
to affix the wall plate
insert in position, and
tighten them.
5.2 Installing the Cables
To install the cables, do the following:
1. Connect the cables to the inside of the unit.
2. Insert the self-locking ties through the tie holes to secure the cables to the
inside walls of the enclosure.
5.3 Installing the Power Socket
To install the power socket:
1. Insert the modular power socket in its place (in this example, a universal
power socket is shown, but you can use any of the available power sockets,
see Section 4.1).
2. Tighten the two screws (supplied with the power socket module).
The power socket is now installed.