Supermicro CSE-523L-410B — руководство по установке и обслуживанию серверных стоек [39/52]
![Supermicro CSE-523L-410B [39/52] Warnings and precautions](/views2/1190283/page39/bg27.png)
SC523 Chassis Manual
6-2
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to •
the oor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack.•
In multiple rack installations, the racks should be coupled together.•
Always make sure the rack is stable before extending a component from the •
rack.
You should extend only one component at a time - extending two or more si-•
multaneously may cause the rack to become unstable.
General Server Precautions
Review the electrical and general safety precautions that came with the com-•
ponents you are adding to your chassis.
Determine the placement of each component in the rack • before you install the
rails.
Install the heaviest server components on the bottom of the rack rst, and then •
work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from •
power surges, voltage spikes and to keep your system operating in case of a
power failure.
Allow the hot-swappable hard drives and power supply modules to cool before •
touching them.
Always keep the rack's front door and all panels and components on the servers •
closed when not servicing to maintain proper cooling.
Warnings and Precautions
!
!
Содержание
- User s manual p.1
- Release date august 9 2011 p.2
- Printed in the united states of america p.2
- Manual revision 1 a p.2
- Warning handling of lead solder materials used in this product may expose you to lead a chemical known to the state of california to cause birth defects and other reproductive harm p.2
- Sc523 chassis manual p.2
- Preface p.3
- Chapter 6 rack installation p.4
- Manual organization p.4
- Chapter 5 chassis setup and maintenance p.4
- Chapter 4 system interface p.4
- Chapter 3 chassis components p.4
- Chapter 2 system safety p.4
- Chapter 1 introduction p.4
- Table of contents p.6
- Chapter 5 chassis setup and maintenance p.6
- Chapter 4 system interface p.6
- Chapter 3 chassis components p.6
- Chapter 2 system safety p.6
- Chapter 1 introduction p.6
- Chapter 6 rack installation p.7
- Appendix b sc523 power supply specifications p.7
- Appendix a sc523 chassis cables p.7
- Part numbers p.9
- Introduction p.9
- Chapter 1 p.9
- 2 shipping list p.9
- 1 overview p.9
- 3 contacting supermicro p.10
- System safety p.11
- Chapter 2 p.11
- 4 electrical safety precautions p.11
- 3 preparing for setup p.11
- 2 warnings and precautions p.11
- 1 overview p.11
- 5 general safety precautions p.13
- 6 system safety p.13
- Power supply p.15
- Mounting rails p.15
- Chassis components p.15
- Chassis p.15
- Chapter 3 p.15
- 2 components p.15
- 1 overview p.15
- Air shroud p.16
- 3 where to get replacement components p.16
- System interface p.17
- Chapter 4 p.17
- 2 control panel buttons p.17
- 1 overview p.17
- 3 control panel leds p.18
- 1 overview p.20
- General maintenance p.20
- Chassis setup and maintenance p.20
- Chapter 5 p.20
- 2 installation procedures p.20
- 3 removing the chassis cover p.21
- Perforated tabs p.22
- Air shroud p.22
- 4 removing and installing the air shroud p.22
- 5 removing and installing hard drives p.23
- Mounting screws p.26
- 6 removing and installing the dvd or cd rom p.26
- Installing the i o shield p.27
- I o shield p.27
- 7 installing the motherboard p.27
- Hard drive p.28
- Dvd rom cd rom floppy drive p.28
- Permanent and optional standoffs p.28
- Motherboard installation p.28
- M b standoffs p.28
- Pci slot setup p.30
- Pci slot cover p.30
- Expansion card slots p.30
- Installation complete p.32
- 8 checking the airflow in the system p.32
- System fans p.33
- 9 system fans p.33
- Power supply replacement p.34
- 10 removing and instaling the power supply p.34
- Power supply bracket screws p.35
- Power supply bracket p.35
- Mounting screws p.35
- Mounting screws p.36
- Power supply bracket screws p.36
- Power supply bracket p.36
- Rack installation p.38
- Choosing a setup location p.38
- Chapter 6 p.38
- 3 preparing for setup p.38
- 2 unpacking the system p.38
- 1 overview p.38
- Warnings and precautions p.39
- Rack precautions p.39
- Reliable ground p.40
- Reduced airflow p.40
- Rack mounting considerations p.40
- Mechanical loading p.40
- Circuit overloading p.40
- Ambient operating temperature p.40
- Rail brackets p.41
- Identifying the sections of the rails p.41
- 4 rack mounting instructions p.41
- Installing the chassis into a rack p.44
- Installing the server into a telco rack p.46
- Sc523 chassis cables p.47
- Appendix a p.47
- A 1 overview p.47
- Alternate sas sata cables p.48
- A 3 compatible cables p.48
- Front panel to the motherboard p.49
- Extending power cables p.49
- M b standoffs p.50
- Hard drive p.50
- Dvd rom cd rom floppy drive p.50
- A 5 chassis screws p.50
- The accessory box includes all the screws needed to set up your chassis this p.50
- Section include descriptions of the most common screws used your chassis may not require all the parts listed p.50
- Sc523 chassis manual p.50
- Sc523 power supply specifications p.51
- Appendix b p.51
Похожие устройства
-
Supermicro CSE-825TQ-R740LPBИнструкция по эксплуатации -
Supermicro CSE-815TQ-600CBИнструкция по эксплуатации -
Supermicro CSE-732D2-500BИнструкция по эксплуатации -
Supermicro cse-745btq-r1k28b-sqИнструкция по эксплуатации -
Supermicro cse-733tq-500bИнструкция по эксплуатации -
Supermicro cse-733t-500bИнструкция по эксплуатации -
Supermicro cse-826be16-r1k28lpbИнструкция по эксплуатации -
Supermicro cse-732i-865bИнструкция по эксплуатации -
Supermicro cse-732i-500bИнструкция по эксплуатации -
Supermicro cse-743tq-865b-sqИнструкция по эксплуатации -
Supermicro cse-835tq-r800bИнструкция по эксплуатации -
Supermicro cse-836be16-r920Инструкция по эксплуатации
Узнайте о важных мерах предосторожности при установке серверных стоек. Обеспечьте стабильность, правильное размещение компонентов и защиту от перепадов напряжения.