Moxa TCC-120I [12/18] Installation

Moxa TCC-120I [12/18] Installation
2
2. Installation
This chapter includes information about how to install the TCC-120/120I.
Five steps are required to install the TCC-120/120I:
STEP 1: Set the terminator DIP Switches
STEP 2: Attach the Power Supply
STEP 3: Wire the RS-422/485 Terminal Blocks
STEP 4: Test the Connection
STEP 5: Placement
The details of each of these five steps are described next.
The following topics are covered in this chapter:
STEP 1: Set the DIP Switches
STEP 2: Attach the Power Supply
STEP 3: Wire the Terminal Block
STEP 4: Test the Connection
STEP 5: Placement
Скачать