Castel MAC HC 40 NTV [4/18] General documentation

Castel MAC HC 40 NTV [4/18] General documentation
4
GB
1. GENERAL DOCUMENTATION
1.1. General information
This manual is an integral part of the product
and it gives all the information necessary for
the correct installation, use and maintenance
of the machine.
It is essential for the user to read the manual
and to always refer to it when for the use of
the machine. Furthermore it must be con-
served in a well-known place that is accessi-
ble to all the authorised operators (installa-
tion engineer, user and maintenance engi-
neer).
The machine conforms with the low voltage
directive 2006/95/CE, electromagnetic com-
patibility directive 89/336/EEC and machines
directive 98/37/EC (only for some models).
The machine is designed for professional
use and therefore only qualified persons may
use it.
• The machine is only intended for the uses it
has been designed for and that is the con-
servation of foodstuffs.
Products requiring constant temperature
checking and recording are excluded such as:
- thermoreacting chemical products.
- medical products
- haemoderivatives
The manufacturer declines all liability for any
damage caused by improper or unreason-
able use such as for example:
improper use by untrained personnel
technical modifications or interventions that
are not model specific
use of non-genuine spare parts or parts that
are not model specific.
failure to comply, even partially, with the
instructions in this manual
This appliance is not intended for use by persons
-including children- with reduced physical, sen-
sory or mental capabilities, or lack of experience
and knowledge, unless they have been fiven
superfision or instruction concerning use of the
appliance by a person responsible for their safeti.
Children should be supervised to ensure that they
do not play with appliance.
1.2 Installation
Installation only by people who are authorised
and have the specific skill, respecting the
instructions in this manual.
If the machine has a remote condenser unit,
the installation engineer must check all the con-
nections in accordance with the instructions
given by Castelmac for system and machine
installation.
1.3 Transport and handling
The loading and unloading of subsystems
from vehicles must be done with a forklift
truck or pallet trolley with forks that are
longer than half the object to be moved.
The lifting device must be chosen on the
basis of the dimensions of the packaged
components and have an adequate capacity.
• When moving the equipment/subsystems
you must adopt all the precautions neces-
sary so as not damage them, observing the
instructions on the packaging (fig.1).
1.4 Unpacking
Remove the cardboard or wooden packaging
or crates from the wooden base on which
they are resting. Then lift the sub-assemblies
with a suitable device (forklift truck), remove
the wooden base and position the sub-
assemblies where they are required.
After removing the packaging, make sure
that the machine is undamaged.
Remove the protective PVC film on the pan-
els from all the sides both inside and
out
(fig.2) (for the stainless steel versions.
Wear protective gloves when han-
dling the packaging and the wooden
base.

Содержание

Скачать