Brita PURITY 1200 Steam без дисплея [24/162] Installation

Brita PURITY 1200 Steam без дисплея [24/162] Installation
22
The pressure vessel and the pressure vessel lid of the fi lter systems have a service life of up
to ten years (from the date of installation), provided that they are installed and used correctly
and the operating conditions outlined in the Technical Data chapter are adhered to. They must
always be replaced after a maximum of ten years. The hoses must be replaced in rotation after
a maximum of fi ve years.
• Production date:
Production code sticker fi lter cartridge and box, example: B812002010
8 Production year, here: 2008
12 Production week, here: calendar week 12
002 Batch No. of fi lter medium, here the second batch fi lled in terms of quantity
010 Serial number of the fi lter cartridge, here the tenth cartridge from the second batch
Production code sticker connector head - Example: 1001801 E 119311008764
1001801 BRITA identi cation number
E Supplier ID
1 Production year, here: 2011
19 Production week, here: calendar week 19
3 Production day from Monday (1) to Friday (5), here: Wednesday
11 Production year, here: 2011
008764 Serial identi cation number
Production date of pressure vessel and pressure vessel lid, example: 0308
03 Production month, here: March
08 Production year, here: 2008
3.5 Safety Assembly Instructions
The terminal device operated with the fi lter must be free of limescale prior to installation.
Protect the fi lter system from sunlight and mechanical damage. Do not assemble near sources
of heat and open fl ames.
A stop valve must be installed before the fi lter system intake hose.
If the water pressure is higher than 6.9 bar or if there are statutory requirements, a pressure
reducer must be installed before the fi lter system.
A non-return valve tested by the DVGW has been factory-installed at the water intake of the
lter head.
No copper pipes and no galvanised or nickel-plated pipes/connectors may be installed between
the water fi lter and the consumer. The use of BRITA hose sets is recommended here. When
choosing the material for parts that come into contact with water after the BRITA fi lter system
it must be remembered that, due to the process, decarbonised water contains free carbon
dioxide.
All parts must be installed in accordance with the country-speci c guidelines on the installation
of drinking water facilities.
For erection and operation of the fi lter system, the BG rules “Working in Kitchens” of the Spe-
cialist Committee “Foods” of the BGZ (BGR111) must be observed.
4 Installation
!
Caution: Prior to installation, read the Technical Data (Chapter 12) and the Operating and Safety
Information (Chapter 3). After the product has been stored and transported at temperatures below
0°C, it must be stored with the original packaging open for at least 24 hours at ambient temperature
(Chapter 12) before commissioning.
4.1 Delivery Scope
Prior to installation, remove the entire delivery scope from the packaging and check that everything
is present:
1 x Pressure Vessel
1
1 x Pressure Vessel Lid
3

Содержание

Похожие устройства

Скачать