Cuenod C.210 GX 507/8 T1 — общие сведения о безопасности и установке оборудования [2/56]
Превью страниц
Страница 2 /
56
![Cuenod C.160 GX 507 T2 [2/56] Contents guarantee safety main statutory instruments](/views2/1435032/page2/bg2.png)
03/2008 - Art. Nr. 13 013 477C2
General information
Contents
Guarantee, safety
Main statutory instruments
Contents
General Information
Guarantee, safety................................ 2
Main statutory instruments .................. 2
Overview ............................................. 3
Technical data
See technical data N° 13013478
Installation
Assembly............................................. 4
Gas connection ................................... 5
Electrical connection ........................... 5
Leakage controller assembly............... 5
pF-pL pressure take-off connection..... 5
Start-up
Preliminary check-up and
leakage test......................................... 6
Settings ...................................... 6 to 12
Control and safety unit program
characteristics ................................... 13
Display.........................................14 -15
Functions, control panel TC .............. 16
Firing ................................................. 17
Maintenance..................................... 18
Troubleshooting.............................. 19
Guarantee
Installation and start-up must be
performed in accordance with current
accepted practices by a technician.
Current regulations , as well as the
following instructions must be complied
with. Any failure, however minor, to
observe these provisions shall absolve
the manufacturer from any liability.
Also see:
- guarantee enclosed with burner,
- conditions of sale.
Safety
The burner is designed to be installed on
a generator connected to exhaust pipes
used for combustion products in working
conditions.
It should be used in an area where an
adequate supply of fresh air is available
for correct combustion and where any
vitiated products can be properly
evacuated.
Flue size and design mut be appropriate
to the fuel, in accordance with current
regulations and standards.
Power supply (230 VAC % 50Hz
±1%
)
to the control unit, as well as to cut-off
devices used, must include an earthed
neutral wire.
Otherwise, power supply to the burner
must include an isolating transformer
and appropriate protection (30mA circuit
breaker and fuse).
Burner must be able to be isolated from
the system via a multipole switch
complying with current standards.
Operating staff should always act with
extreme caution and especially avoid
direct contact with areas that are not
heat-insulated and electrical circuits.
Do not splash water on the burner’s
electrical components.
In the event of flooding, fire, fuel leakage
or any other dangerous situation (smell,
suspicious sounds, etc.), stop burner,
cut main power supply and fuel supply
and call a technician.
Furnaces and their accessories, flues
and connection pipes must be
maintained, cleaned, and swept at least
once a year and prior to starting up
burner. Consult current regulations.
Main statutory instruments “FR”
Dwellings:
- French Order dated 2nd August 1977
and later modifying / supplementary
orders: Technical and safety
regulations governing combustible
gas and liquified hydrocarbon
installations located inside dwellings
and their outbuildings.
- DTU Standard P 45-204: Gas
installations (formely DTU n° 61-1 -
Gas installations - April 1982 + later
addendums).
- DTU Standard 65.4 - Boiler house
technical provisions.
- French NF Standard C15-100 - Low
voltage electrical installation
regulations.
- French Departmental health
regulations.
Public Buildings :
- Public building fire and panic
prevention safety regulations:
General provisions :
- GZ sections (combustible gas and
liquified hydrocarbons);
- CH sections (heating, ventilation,
cooling, air conditioning and steam
and domestic hot water production);
Provisions specific to each type of public
building.
Outside “FR”
Refer to local regulations.
+
10
- 15
Содержание
131- Contents guarantee safety main statutory instruments
- General information
- General information
- Overview
- Assembly
- Installation
- Gas and electrical connections
- Installation
- Start up
- Preliminary check up and leakage test setting air pressure switch
- This is the amount of air flowing between the turbulator diameter and blast tube turbulator position dimension
- Start up
- On delivery dimension
- Maintained head settings system
- Is set at 35mm
- Is read on the 0 to 50mm graduated scale of the
- Checking and setting combustion components secondary air
- Start up
- Settings diffusers and injectors
- Start up
- Description and settings combustion air
- Start up
- Description and settings mbvef gas valve
- Description and settings vgd gas valve skp75 regulator
- Start up
- Start up
- Description and settings gas valve leakage controller
- Start up
- Control and safety unit characteristics unit sg 513 operation diagram
- Start up
- Display
- Display
- Start up
- Comment values in grey and italics are given as examples
- 2008 art nr 13 013 477c 15
- Start up
- Functions control panel tc
- Working cycle test firing setting and checking safety units
- Start up
- Maintenance
- Troubleshooting
- To find out what other information shown by the unit mean specific equipment is available and is suited to the sg 513 unit
- Safety components must not be repaired but replaced by similar items only use manufacturer spare parts
- Note after each operation check combustion and all circuits for possible leaks perform safety check up record results in the relevant documents
- If problem persists check light signals of control and safety unit and their symbols described in table herebelow
- Check the following if failure occurs power supply power and control fuel supply valve pressure and opening control components switch positions on tc control panel
- 2008 art nr 13 013 477c 19
- Übersicht
- Inhaltsverzeichnis gewährleistung sicherheit grundsätzliche bestimmungen
- Übersicht
- Gesamtansicht
- Montage
- Montage
- Gasversorgung elektrische versorgung
- Prüfung vor inbetriebnahme dichtheitsprüfung einstellung des luftdruckwächters
- Inbetriebnahme
- Prüfungen und einstellungen mischeinrichtung sekundärluft
- Inbetriebnahme
- Inbetriebnahme
- Einstellungen gasdüsen
- Inbetriebnahme
- Brennluft
- Inbetriebnahme
- Beschreibung und einstellungen kompaktarmatur mbvef
- Inbetriebnahme
- Beschreibung und einstellungen gasventil vgd regler skp75
- Inbetriebnahme
- Beschreibung und einstellungen dichtheitskontrollgerät
- Kenndaten des feuerungsautomaten programmablauf des feuerungsautomaten sg 513
- Inbetriebnahme
- Inbetriebnahme
- Anzeigeeinheit
- Inbetriebnahme
- Bemerkung auf grauem hintergrund sind werte als beispiel dargestellt
- Anzeigeeinheit
- 2008 art nr 13 013 477c 33
- Inbetriebnahme
- Funktion schaltfeld tc
- Kontrolle des programmablaufs zündung einstellung und kontrolle der sicherheitseinrichtungen
- Inbetriebnahme
- Der brenner läuft automatisch wieder an
- Wartung
- Wenn die störung weiter besteht die vom feuerungsautomat abgege benen lichtsignale beachten und ihre bedeutung aus nachstehender tabelle entnehmen
- Störungsbeseitigung
- Hinweise nach jedem eingriff unter echten betriebsbedingungen geschlossene türen montierte haube usw die verbrennung kontrol lieren sowie die einzelnen leitungen auf dichtheit prüfen die ergebnisse in den entsprechen den unterlagen dokumentieren
- Bei störungen müssen die grundsätz lichen voraussetzungen zum ord nungsgemäßen betrieb kontrolliert werden ist strom vorhanden ist gasdruck vorhanden ist gasabsperrhahn geöffnet sind alle regel und sicherheits geräte wie kesselthermostat wassermangelsicherung end schalter usw richtig eingestellt
- Alle sicherheitsrelevanten komponen ten dürfen nicht repariert werden sondern müssen durch teile mit derselben bestellnummer ersetzt werden nur originalersatzteile verwenden
- 2008 art nr 13 013 477c 37
- Zur entschlüsselung weiterer informa tionen des automaten sind sonderge räte erhältlich die sich an das automat sg 513 anpassen lassen
- Общая информация
- Содержание гарантия правила безопасности основные законодательные нормы
- Общий вид
- Общая информация
- Монтаж
- Установка
- Подключение газа электричества
- Установка
- Пуск
- Предварительный контрль проверка на утечки установка реле давления воздуха
- Пуск
- Контроль и настройки смесительное устройство вторичный воздух
- Пуск
- Настройки газовые сопла
- Пуск
- Регулирование воздуха
- Описание и настройки компактная арматура mbvef
- Пуск
- Пуск
- Описание настройки газовый клапан vgd регулятор skp75
- Описание и настройки орган контроля плотности
- Пуск
- Характеристики прибора управления функциональная схема прибора sg 513
- Пуск
- Пуск
- Дисплей
- 2008 art nr 13 013 477c 51
- Примечание параметры на сером фоне являются примерами
- Пуск
- Дисплей
- Функции панель управления тс
- Пуск
- Контроль рабочего цикла розжиг настройка и контроль предохранительных приборов
- Пуск
- Техуход
- В ниличии имеются специальные устройства которые могут быть адаптированы к прибору sg 513 для обеспечения понимания любой другой информации передаваемой прибором управления
- Техуход
- Если помеха сохраняется считайте символы на приборе управления и выясните их значение в таблице ниже
- В случае помех необходимо проверить подачу напряжения напряжение и управление подачу топлива давление и открытие клапана элементы управления положения выключателя на панели управления тс
- 2008 art nr 13 013 477c 55
- Примечания после каждой операции проверьте параметры сгорания и все контуры на возможные утечки проведите контроль безопасности запишите результаты в соответствующие документы
- Все компоненты обеспечения безопасности не должны ремонтироваться они лишь подлежат замене на идентичные компоненты используйте только оригинальные детали изготовителя
Похожие устройства
-
Cuenod NC 21 H 201 T2Буклет -
Cuenod NC 21 H 201 T2Инструкция по эксплуатации -
Cuenod NC 21 H 201 T1Буклет -
Cuenod NC 21 H 201 T1Инструкция по эксплуатации -
Cuenod NC 16 H 201 T2Буклет -
Cuenod NC 16 H 201 T2Инструкция по эксплуатации -
Cuenod NC 16 H 201 T1Буклет -
Cuenod NC 16 H 201 T1Инструкция по эксплуатации -
Cuenod NC 12 H 201 T2Буклет -
Cuenod NC 12 H 201 T2Инструкция по эксплуатации -
Cuenod NC 12 H 201 T1Буклет -
Cuenod NC 12 H 201 T1Инструкция по эксплуатации
Узнайте о гарантии, безопасности и установке оборудования. Следуйте инструкциям для правильного подключения и эксплуатации, чтобы избежать опасных ситуаций.