Zkteco FBL1000 [2/8] Test procedure

Zkteco FBL1000 [2/8] Test procedure
Chapter 1 Power-on Test Prior to Installation
Test Procedure
Connect cables to the devices and supply the input power of AC 100-120V / 200-240V (Note that a ground cable
must be connected).
1
Start the air switch and wait 10 seconds till the flap barrier completes the self-test procedure.
2
Check the flap barrier and the LED indicators functions. If all function properly, then start the civil installation. If
an exception occurs, contact your sales agent.
1

Похожие устройства

Скачать