Daikin EWAD360TZ-SLB1 [14/104] Options

Daikin EWAD420TZ-XRB2 [14/104] Options
Master / Slave (opt. code 128 – provided as standard)
The EWAD~TZ B featuresthenew DAIKINMaster/Slave (M/S)control. Once set which unit hastherole of
master,theother(s)willoperateasslave(s)basedontheinputsprovidedbythemaster.
Thechillersmustbeinstalledinparallelinthehydronicplant.
withMaster/Slavecontrolispossibleto:
-balancetheworkinghoursofthecompressorsenhancingreliabilityandextendingthelifeofthesystem
-balancingtheloadbetweentheunitstomaximizetheefficiencyofthesystem
InordertooperateinMaster/Slavemodeanadditionalprobe(PT1000orNTC10K)mustbeinstalledonthe
common line of the plant and connected to the mastes unit. The additional probe is not provided by the
factory.
Master/Slavecanmanageunitsselectedwithpumponboard(fixspeedandinverterdrivenpumps).
Note:checkvalvesmustbeinstalledattheoutletofeachchiller.
Master/ Slavecan alsomanagethestart and stopof external pumps (notprovided byfactory). The power
supplyofexternalpumpsisnotprovidedbytheunit.

Refrigerant leak detection (opt. code 121) Automated permanent refrigerant leak detection system
installed on board. The refrigerant sensors are installed within the compressor acoustic enclosures and are
specificallycalibratedforR134arefrigerant.Whenleaksaboveacertainconcentrationaredetected,thesensor
sendsasignaltotheunitcontroller(aspecificalarmisvisualizedontheunitmicroprocessor).Theautomatic
shut down and pump down of refrigerant into the condensing section occurs on the detection of refrigerant
leakage. The alarm threshold that triggers automatic pump down upon detection of refrigerant is set to a
maximumof2000ppm.AvailableonlyforReducedSoundconfiguration
Blue coat (opt. code 153)
Anepoxypowderissprayedandelectrostaticallyfixedtothecoil.Oncethesurfaceiscompletelycoveredby
theepoxy material,thecoilissentinto afurnaceforthedryingandcuringphase.Theresultisanuniform
and durable coating that enhance the resistance to the corrosion. The treatment is recommended in all
applicationwheremoderateriskofcorrosionexist(eg:urban,costal,industrialenvironments)
E-coating microchannel coils (opt. code 139)
Aprotectionalayerofanepoxypolymerisaddedonthesurfaceoftheexchanger.Theprocessconsistsinthe
complete immersion of the exchanger in the epoxy polymer solution. An electric voltage applied to the
exchangercausesadifferencewiththeelectricalchargeofthepolymermoleculesthat,asresult,aredrawnto
themetal.The thicknessof the coating iscontrolled bythe appliedvoltage. The result is a uniformlayer of
epoxy polymers applied all over the exchanger surface. A final UV top-coat treatment is applied on the coil
surface.Thetreatmentisrecommendedinallapplicationwherehighriskofcorrosionexist(eg:highpollutted
urban,costal,industrialenvironmentsandtheircombinations).
