Daikin EWYQ021BAWP [217/223] Turn power on

Daikin EWYQ021BAWP [217/223] Turn power on
Test Run ESIE11-05
206 Commissioning and Test Run
1.2.2 Turn Power On
Be sure to turn the power on 6 hours before starting operation to protect
compressors. (to power on crankcase heater)
Check to be sure the transmission is normal.
The transmission is normal if the LEDs display conditions as shown in
table below.
(*) The master unit is the outdoor unit next to the hydrobox.
The other outdoor unit is the slave.
Make field settings if needed.
(For the setting procedure, refer to information in "Field Setting
from Outdoor Unit".)
For EW*Q040BA, EW*Q050BA and EW*Q064BA, make field settings
with the master unit.
(Field settings made with the slave unit will be all invalid.)
The check operations shown below will be automatically initiated.
• Check for erroneous wirings
• Check for failure to open stop valves
Turn outdoor unit and indoor
unit power on.
Check the LED display of the
outdoor unit PCB.
Conduct check operations.
Check for normal operation.
Make field settings with outdoor
unit PCB.
LED display
(Default status before
delivery)
Micro-
computer
operation
monitor
MODE
HAP
l
l
l
l
l
l
H1P
h
h
h
h
h
h
H2P
h
h
h
h
h
h
H3P
k
k
h
h
H4P
h
h
h
h
h
h
H5P
h
h
h
h
h
h
H6P
h
h
h
h
h
h
H7P
h
h
h
h
h
h
H8P
h
h
k
l
l
Master
Slave 1
One outdoor unit installed
EW*Q040BA
EW*Q050BA
EW*Q064BA(*)
TEST
IND
COOL / HEAT select
LED display
k
ON h
h
OFF l
l
Blinkin
g
MASTER
SLAVE
Low
noise
Demand
Mult
i

Содержание

Скачать