VTS VENTUS PRO PVS PO 30 AC [7/34] Installation

VTS VENTUS PRO PVS HY C36 [7/34] Installation
7
OIMM – VENTUS PRO
put into service a clean AHU labelled with provided pictograms and VTS labels, ready to be connected to a
power source (wiring), utilities and control systems,
hand control elements over to the client’s representative if at his request they were not assembled in the
AHU,
hand a lled in Warranty Card of a VTS AHU over to the Client,
hand the ‚Assembly Acceptance Protocol’ documentation to be signed by the client and provide them with a
copy of this document,
put assembly waste in a place indicated by the client’s representative not farther than 20 meters away from
the place of assembly,
leave the assembly place in the state from before the assembly.
VTS on-site assembly does not include:
setting up of electrical wiring, connection to heating of freezing sources and assembly of exchanger valve,
connection, assembly and start-up of control elements (except for damper actuators, pressure control and
anti-frost thermostat) and engines zeroing,
placing, balancing and anchoring of air handling units,
connecting air handling units to ventilation ducts, utilities and electricity,
start-up of air handling units,
recycling of containers in which air handling units were delivered.
! During nal installation the requirements of EN 60204-1 do apply.
! Before manufacturing air handling unit, the client should check the conditions at site to ensure
that access routes are adequate for both size and weight of the unit sections. Air handling unit
installation areas should also be checked.
! There should be sufcient space around the unit for servicing, maintenance and piping
connections. Further, it must be ensured that the base is high enough from the oor to allow
the condensate drain with necessary water trap.
! AHUs must be anchored to the foundation. Anchoring AHUs is out of VTS delivery.
! The AHU should be installed so that connections of any related systems (ventilation ducts,
pipelines, cabling, etc.) do not collide with the inspection panels.
! It is forbidden to place any elements on the AHU as well as use the AHU as a support of
ventilation ducts and other building components.
The AHU installation clearance is dened by:
rear side of the unit - minimum space required allowing access and operations on connecting
point
front side of the unit - minimum space require allowing opening access door to position
perpendicular to the AHU longitudinal axis
minimum distance between the front side and existing construction elements in order to
carry out the assembly, operation and maintenance successfully.
! In AHUs where the exchangers’ connections are led to the side opposite to the access side an
appropriate distance required for proper assembly of the power supply installation elements
should be maintained.
! There is possible to install other systems, pipelines, pillars in the operation area only if they can
be easily disassembled for the maintenance and service procedures.
!