2 Pull the boiler controller unit forwards. The boiler controller will tip
downwards to provide access.
9.3 Mounting the outdoor unit
9.3.1 About mounting the outdoor unit
When
You have to mount the outdoor unit and gas boiler before you can connect the
water piping.
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1 Providing the installation structure.
2 Installing the outdoor unit.
3 Providing drainage.
4 Preventing the unit from falling over.
5 Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See "Preparing installation site" in "8Preparation"[456].
9.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
9.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
This topic shows different installation structures. For all, use 4 sets of M8 or M10
anchor bolts, nuts and washers. In any case, provide at least 300mm of free space
below the unit. Additionally, make sure the unit is positioned at least 100 mm
above the maximum expected level of snow.