Daikin RXM35R5V1B [21/68] Outdoor unit

Daikin RXM35R5V1B [21/68] Outdoor unit
4 | About the box
Installer reference guide
21
RXJ-M(9)_RXA-A(9)_RXM-R(9)_ARXM-R(9)
R32 Split system air conditioners
4P519439-12M – 2021.02
4 About the box
4.1 Overview: About the box
This chapter describes what you have to do after the box with the outdoor unit is
delivered on-site.
Keep the following in mind:
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
Prepare the path along which you want to bring the unit inside in advance.
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid damage.
Keep the unit away from rain or damp conditions.
At least 2persons MUST handle the box with the unit.
4.2 Outdoor unit
4.2.1 To unpack the outdoor unit

Содержание

Похожие устройства

Скачать