Daikin FLOSTO150 [18/24] Inspection and maintenance
![Daikin FLOSTO150 [18/24] Inspection and maintenance](/views2/1797922/page18/bg12.png)
8 Inspection and maintenance
Installation and operating instructions
18
Daikin FLOSTO150
Hot water storage tank
008.1632099_00 – 03/2019 – EN
8 Inspection and maintenance
Regular inspection of the hot water storage tank guarantees a long
service life and fault-free operation.
An external current anode is only necessary if the filling water is very
hard and contains chloride (>/= 250mg/l). Please contact your local
water supply company for further information.
DANGER: RISK OF ELECTROCUTION
Touching live parts can result in an electric shock and lead
to potentially fatal injuries and burns.
▪ If there is an electric immersion heater or an external
current anode installed in the hot water storage tank,
these components must be isolated from the power sup-
ply before starting work (e.g. fuse, main switch switched
off and secured against inadvertent switching on again).
DANGER: RISK OF ELECTROCUTION
All work performed on live components must be carried out
in accordance with the proper procedures, otherwise there
may be a danger to the life and health of personnel and the
function may be impaired.
▪ Rectification of damage to live components may only be
carried out by heating specialists authorised and recog-
nised by the energy supply company.
8.1 Annual inspection
If present:
▪ Carry out a functional inspection of the electric immersion heater
by checking the temperature display and the switching states in
the individual operating modes:
▪ Electric immersion heater: See the associated installation and
operating instructions.
▪ Visual inspection of the general condition of the hot water storage
tank.
▪ Visual check of connections and pipes. In the event of damage,
determine the cause.
1 Replace defective parts.
– Check all electrical components, connections and cables.
2 Repair damaged parts or replace them.
– Check the water pressure of the cold water supply (<6bar)
3 and, if necessary, the fitting or setting of the pressure reducer.
8.2 Cleaning
INFORMATION
It is recommended that the stainless steel accumulator is
cleaned by a specialist every two years at the latest.
INFORMATION
Before opening the inspection opening, close the cold wa-
ter line valve and empty the tank.
1 Remove the device front panel and housing cover.
Fig.8-1 Removing the thermal insulation
2 Remove the thermal insulation from the inspection opening.
Fig.8-2 Remove the M8 nut
3 Loosen the M8 nut of the mounting bracket. Leave the M8 nut on
the threaded bolt.
Fig.8-3 Removing the lid
4 Loosen the mounting bracket and push the cover into the tank
until it moves freely.
Содержание
- Flosto150 1
- Installation and 1
- Operating instructions 1
- Commissioning 14 3
- General safety precautions 4 3
- Handover to operator and warranty 7 3
- Hydraulic connection 16 3
- Inspection and maintenance 18 3
- Installation and operating instructions 3
- List of contents 3
- List of keywords 23 3
- Notes 22 3
- Product description 8 3
- Set up and installation 10 3
- Taking out of operation 15 3
- Technical data 20 3
- General safety precautions 4
- Observing the instructions 4
- Particular safety instructions 4
- General 5
- General safety precautions 5
- Intended use 5
- Meaning of warnings and symbols 5
- Safety instructions for installation and operation 5
- Device installation room 6
- Electrical installation 6
- General safety precautions 6
- Heating system and sanitary connection 6
- Operation 6
- Requirements for the filling water 6
- Handover to operator and warranty 7
- Instruct the owner 7
- Warranty conditions 7
- Design and components 8
- Product description 8
- Circulation brakes 9
- Circulation line connection 9
- Electric immersion heater 9
- External current anode 9
- Installing optional accessories 9
- Product description 9
- Scalding protection 9
- Storage tank connection kit 9
- Important information 10
- Installation 10
- Installing the hot water storage tank 10
- Scope of delivery 10
- Set up and installation 10
- Mounting removing the storage tank cladding 11
- Set up and installation 11
- Hydraulic system connection 12
- Important information 12
- Installation 12
- Set up and installation 12
- Filling topping up 13
- Hot water storage tanks 13
- Set up and installation 13
- Commissioning 14
- Draining the heating circuit 15
- Draining the storage tank 15
- Final shutdown 15
- Taking out of operation 15
- Temporary shutdown 15
- F b n o c o r 16
- Hydraulic connection 16
- Hydraulic system connection 16
- Mk1 mk2 16
- Rocon m1 16
- Hydraulic connection 17
- Mk1 mk2 17
- Annual inspection 18
- Cleaning 18
- Inspection and maintenance 18
- Inspection and maintenance 19
- Basic data 20
- Performance diagrams 20
- Technical data 20
- Technical data 21
- Tightening torques 21
- List of keywords 23
Похожие устройства
- Daikin FLOSTO150 Инструкция по монтажу
- Falcon Eye FE-SD90A/15M Инструкция по эксплуатации
- Falcon Eye FE-SDV88A/30M Инструкция по эксплуатации
- Falcon Eye FE-SDV90A/30M Инструкция по эксплуатации
- Falcon Eye FE-CC89 Инструкция по эксплуатации
- Falcon Eye FE DA82/10M Инструкция по эксплуатации
- Falcon Eye FE-DA90/10M Инструкция по эксплуатации
- Falcon Eye FE-MDV90/15M Инструкция по эксплуатации
- Falcon Eye FE-90Z Инструкция по эксплуатации
- Falcon Eye FE-B90A Инструкция по эксплуатации
- Falcon Eye FE-B90A/10M Инструкция по эксплуатации
- Falcon Eye FE-2204HDS Инструкция по эксплуатации
- Falcon Eye FE-101AVR Инструкция по эксплуатации
- Falcon Eye FE-MTR300 Инструкция по эксплуатации
- Tefal VS7001 Инструкция по эксплуатации
- Miele DG 4164 L Инструкция по установке
- Miele DG 4164 L Инструкция по эксплуатации
- Miele DG 5040 Инструкция по эксплуатации
- Miele DG 3460 Инструкция по эксплуатации
- Miele DG 3460 Руководство пользователя