6.3. Commissioning includes installation, testing and setting of
equipment, adaptation of the technological process to the
conditions of the customer's production, training and
certification of employees.
6.4. Setting the machine into work consists of checking the
main machine parameters in accordance with this document
and recording the check results. Based on the results of the
inspection and the conclusion about the readiness of the
machine for operation the «Act of acceptance of the machine
into operation» is formed and a mark is placed in the
«Certificate of Commissioning» regardless of the place of
commissioning.
6.5. The act must be signed by a representative of the
manufacturer. With no signature of the representative of the
manufacturer at the «Act of acceptance of the machine into
operation» warranty and post-warranty service is not carried
out.
6.6. Recommended distances when placing the tunnel: from
the wall to the back wall of the tunnel at least 1 m, the
service area from the front wall of the tunnel at least 1.5
2 m.
———
6.1. Монтаж и сдачу в эксплуатацию производят сотрудники или
уполномоченные представители компании KADZAMA на основе
договора при условии своевременного подвода заказчиком
энергоснабжения и обеспечения сжатым воздухом. По желанию