BMW R1150GS (2000) [25/311] Installing sump guard

BMW R1150GS (2000) [25/311] Installing sump guard
00.17
Installing sump guard
Install the spacer bushing at the front left.
X Tightening torque:
Bushing to engine block............................... 20 Nm
Install the front rubber mounts with the long
thread down.
Install the rear rubber mounts.
Install the inner plate with the outer guard.
R21000080

Содержание