MCZ Forma 75 dx [30/40] Operation

MCZ Forma T95 [30/40] Operation
28
7OPERATION
For a better understanding of the amount, size and function of the ventilation outlets to be installed on the cladding, illustrated below is
an installation example with the relative outlets.
1a) Grille for convection air release
1b) Grille for convection air input
Grilles 1a and 1b are essential for releasing the heat the collects in the hood and it is mandatory to t them regardless of the type of
installation or cladding one must t.
START-UP PRECAUTIONS
Make sure you have read and fully understood the contents of this instruction manual.
Remove all components that could burn from the rebox and door (instructions and various adhesive labels).
Remove the stickers from the ceramic glass otherwise the high temperature could melt them and cause irreparable damage to the glass.
The product can be positioned at an angle or against the wall.
Avoid touching the product during the initial start-up, as the paint completes its drying process and hardens during
this phase. It is good practice to guarantee eective ventilation in the room during the initial start-up, as the
product will emit some smoke and smell of paint, which is absolutely normal!
If necessary, touch up the paint with the spray can of the specic colour.
Do not stand close to the product and air the room. The smoke and smell of paint will disappear after about an hour of operation, however,
remember they are not harmful in any case.
The product will be subject to expansion and contraction during the start-up and cooling phases, therefore light
creaking noises may be heard.
This is absolutely normal as the structure is made of laminated steel and must not be considered a defect.
It is extremely important to make sure the product is not immediately overheated and the temperature increases
gradually.
This will prevent damaging the welds and the steel structure.
Do not expect heating eciency immediately!
OPERATION TEST
ATTENTION !!
BEFORE PERFORMING ANY CLADDING ASSEMBLY OPERATION, CARRY OUT A GENERAL TEST ON THE FIREPLACE
FOLLOWING THE POINTS BELOW:
• Lift and lower the hearth door 7-8 times to check that it slides smoothly and that the counterweights do not cause any noise
against the structure.
• Check that all wiring and the control unit (if one ts the COMFORT AIR VF kit) are distant from the hot body of the closed replace.
• Test at all speeds and ventilation kit modalities (if one ts the COMFORT AIR VF kit).
• Light the re with moderation, to check that the smoke tting has no smoke/soot leaks.
THE MANUFACTURER DECLINES ALL LIABILITY FOR DAMAGE TO THE CLADDING IF THE PREVENTIVE CHECKS ABOVE ARE
NOT CARRIED OUT, RESULTING IN THE DEMOLITION OF THE CLADDING ITSELF TO PERFORM REPAIRS OR ADJUSTMENTS.

Содержание

Скачать