Airedale Ultima Compact UCC 300 [22/53] Ultima compact chillers
![Airedale Ultima Compact UCC 360 [22/53] Ultima compact chillers](/views2/1409458/page22/bg16.png)
ULTIMA COMPACT Chillers
Chillers
22
Installation & Maintenance : 903-129 IM E 10/04/C
Installation Data
ELECTRICAL DATA
General
• As standard the equipment is designed for 400V, 3 phase, 3 wire 50Hz and a
separate permanent 230V, 1 phase, 50Hz supply, to all relevant IEE regulations,
British standards and IEC requirements.
• Ensure correct phase rotation.
CAUTION
• A fused and isolated electrical supply of the appropriate phase, frequency and
voltage should be installed.
• The control voltage to the interlocks is 24V. Always size the low voltage interlock and
protection cabling for a maximum voltage drop of 2V.
CAUTION
• Wires should be capable of carrying the maximum load current under non-fault
conditions at the stipulated voltage.
• Avoid large voltage drops on cable runs, particularly low voltage wiring.
• Once the connecting pipework is complete the electrical supply can be connected by
routing the cable through the appropriate casing hole and connecting the cables,
refer to the Wiring Diagram supplied with each unit.
CAUTION
A separately fused, locally isolated, permanent single phase and neutral supply
MUST BE FITTED
for the compressor sump heater, evaporator trace heating and
control circuits, FAILURE to do so could INVALIDATE WARRANTY
.
Always electrically interlock the operation of the chiller with the pump controls and water
flow switch.
Interlocks & Protection
These safety devices prevent the chiller operating with low water flow which can cause
serious damage.
CAUTION
Failure to install both safety devices will invalidate the chiller warranty.
Do not rely solely on the BMS to protect the chiller against low flow conditions.
CAUTION
An evaporator pump interlock and flow switch MUST be directly wired to the
chiller, refer to
Interconnecting Wiring diagram.
Содержание
- Air cooled liquid chiller 30kw 450kw 1
- Installation operating maintenance manual 1
- Ultima compact 1
- About airedale products customer services 2
- Caution 2
- Chillers 2
- Customer services 2
- Spares 2
- Training 2
- Ultima compact chillers 2
- Warranty commissioning maintenance 2
- Chillers ultima compact 3
- Contents 3
- Caution 4
- Chillers 4
- General statement 4
- Important 4
- Safety 4
- Ultima compact chillers 4
- Chillers 5
- Chillers ultima compact 5
- Exclusions 5
- General 5
- Procedure 5
- Returns analysis 5
- Warranty 5
- Warranty is only valid in the event that 5
- Air cooled liquid chiller 6
- Ce directive 6
- Chillers 6
- General description 6
- Introduction 6
- Refrigerants 6
- Ultima compact chillers 6
- Unit identification 6
- Chillers 7
- Construction 7
- Electrical 7
- Features 7
- Refrigeration 7
- Ultima compact 7
- Caution 8
- Chillers 8
- Controls 8
- Electrical 8
- Electronic expansion valves 8
- Factory fitted 8
- General description 8
- Loose item 8
- Optional extras energy saving 8
- Optional extras general 8
- Optional unit cover 8
- Power factor correction 8
- Standard features 8
- Ultima compact chillers 8
- Chillers 9
- Chillers ultima compact 9
- Dimensions single row fans 1 9
- Installation data 9
- Ucc30 ucc80 9
- Ucc75 ucc150 9
- Chillers 10
- Installation data 10
- Point loadings weights centre of gravity c of g 10
- Single row fans 1 10
- Ucc30 ucc80 except ucc75 10
- Ucc75 ucc150 except ucc80 10
- Ultima compact chillers 10
- Chillers 11
- Chillers ultima compact 11
- Dimensions 11
- Double row fans 2 11
- Installation data 11
- Ucc110 ucc450 except ucc125 ucc150 11
- Chillers 12
- Double row fans 2 12
- Installation data 12
- Point loadings weights centre of gravity c of g 12
- Ucc110 ucc450 except ucc125 ucc150 12
- Ultima compact chillers 12
- Caution 13
- Chillers 13
- Chillers ultima compact 13
- Installation data 13
- Lifting dimensions 13
- Unit lifting 13
- Anti vibration mounting optional 14
- Caution 14
- Chillers 14
- Installation data 14
- Pad type 14
- Spring type 14
- Ultima compact chillers 14
- Caution 15
- Chillers 15
- Chillers ultima compact 15
- Installation data 15
- Positioning 15
- Installation data 16
- Ultima compact chillers 16
- Chillers ultima compact 17
- Caution 18
- Chillers 18
- Component recommended requirements 18
- Filling 18
- Installation data 18
- Pressure testing 18
- Pump statement 18
- Ultima compact chillers 18
- Water system 18
- Chillers 19
- Chillers ultima compact 19
- Installation data 19
- Water system 19
- Chillers 20
- Installation data 20
- Ultima compact chillers 20
- Water system 20
- Caution 21
- Chillers 21
- Chillers ultima compact 21
- Ethylene glycol nominal correction factors 21
- Glycol data 21
- Installation data 21
- Propylene glycol nominal correction factors 21
- Caution 22
- Chillers 22
- Electrical data 22
- General 22
- Installation data 22
- Interlocks protection 22
- Ultima compact chillers 22
- Caution 23
- Chillers 23
- Chillers ultima compact 23
- Installation data 23
- Interconnecting wiring 23
- No pumps 23
- Chillers 24
- Double circuit 24
- Installation data 24
- Interconnecting wiring 24
- Ultima compact chillers 24
- With pumps 24
- Chillers 25
- Chillers ultima compact 25
- Electrical data 25
- Installation data 25
- Chillers 26
- Electrical data 26
- Installation data 26
- Ultima compact chillers 26
- Chillers 27
- Chillers ultima compact 27
- Electrical data 27
- Installation data 27
- Chillers 28
- Electrical data 28
- Installation data 28
- Ultima compact chillers 28
- Caution 29
- Chillers 29
- Chillers ultima compact 29
- Constant supply temperature control 29
- Control scheme features 29
- Controls 29
- Variable supply temperature control 29
- Chillers 30
- Controls 30
- General description 30
- Navigation 30
- Operation 30
- Standard keypad display 30
- Standard operating page 30
- Ultima compact chillers 30
- Chillers 31
- Chillers ultima compact 31
- Controls 31
- Menus listed in sequence 31
- Operation cont 31
- Password protection 31
- Real time clock 31
- Setting up 31
- Standard operating page cont 31
- Status menu 31
- Technical support 31
- Time zones 31
- Unit on off optional extra 31
- Viewing unit operating status 31
- Chillers 32
- Controls 32
- Ultima compact chillers 32
- Viewing unit operating status 32
- Alarm handling 33
- Alarms 33
- Chillers 33
- Chillers ultima compact 33
- Common alarms 33
- Compressor status 33
- Controls 33
- Electronic expansion valve failure 33
- Emergency stop 33
- Evaporator flow failure 33
- High liquid pressure 33
- Individual circuit alarms 33
- Low suction pressure 33
- Low supply temperature 33
- Phase rotation 33
- Chillers 34
- Commissioning data 34
- Mechanical data 34
- Oil refrigerant charges 34
- Operating limits 34
- Ultima compact chillers 34
- Caution 35
- Chillers 35
- Chillers ultima compact 35
- Commissioning data 35
- Ucc30 ucc80 35
- Ucc75 ucc150 35
- Waterside pressure drops 35
- Caution 36
- Chillers 36
- Commissioning data 36
- Ucc160 ucc250 36
- Ucc240 ucc450 36
- Ultima compact chillers 36
- Waterside pressure drops 36
- 1 2 3 4 5 6 7 37
- Chillers 37
- Chillers ultima compact 37
- Commissioning data 37
- Pump packages 37
- Ucc30 ucc80 except ucc75 37
- 2 3 4 5 6 7 8 9 10 11 38
- Chillers 38
- Commissioning data 38
- Pump packages 38
- Single head pump or run standby 38
- Ucc75 ucc450 except ucc80 38
- Ultima compact chillers 38
- Chillers 39
- Chillers ultima compact 39
- Commissioning data 39
- Pump packages 39
- Twin head pump 39
- Ucc75 ucc450 except ucc80 39
- Adding refrigerant 40
- Caution 40
- Chillers 40
- Commissioning data 40
- Head pressure 40
- Low pressure 40
- Operational sequence 40
- Pre start up check 40
- Pump down 40
- Refrigerant charge 40
- Sump heater 40
- Ultima compact chillers 40
- Unloading protection 40
- Caution 41
- Chillers 41
- Chillers ultima compact 41
- Commissioning procedure 41
- General 41
- Pre commissioning checklist 41
- Record 41
- Caution 42
- Chillers 42
- Commissioning procedure 42
- Pre commissioning checklist 42
- Record 42
- Ultima compact chillers 42
- Caution 43
- Caution record 43
- Chillers 43
- Chillers ultima compact 43
- Commissioning checklist 43
- Commissioning procedure 43
- Record 43
- Caution 44
- Chillers 44
- General maintenance 44
- Important 44
- Maintenance 44
- Ultima compact chillers 44
- Chillers 45
- Chillers ultima compact 45
- Compressor maintenance 45
- General maintenance 45
- Maintenance 45
- Shut down periods 45
- Chillers 46
- Parts identification 46
- Ultima compact 46
- Chillers 47
- Parts identification 47
- Ultima compact 47
- Chillers 48
- Parts identification 48
- Ultima compact 48
- Chillers 49
- Parts identification 49
- Ultima compact 49
- Chillers 50
- Parts identification 50
- Ultima compact 50
- Chillers 51
- Parts identification 51
- Ultima compact 51
- Head office 52
- International sales offices 52
- Regional sales offices 52
- Airedale departmental contact details 53
- Customer services 53
Похожие устройства
- Airedale Ultima Compact UCC 360 Инструкция по эксплуатации
- Juguni 0402.705 Инструкция по эксплуатации
- Airedale Ultima Compact UCC 450 Инструкция по эксплуатации
- Juguni 0402.730 Инструкция по эксплуатации
- Juguni 0402.740 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 200 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 225 Инструкция по эксплуатации
- Juguni 0402.642 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 250 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 275 Инструкция по эксплуатации
- Juguni 0402.642A Инструкция по эксплуатации
- Juguni 0402.656 Инструкция по эксплуатации
- Juguni 0402.656A Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 300 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 400 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 450 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 500 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 575 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 650 Инструкция по эксплуатации
- Airedale Ultima FreeCool UFC 700 Инструкция по эксплуатации