Tecorp HC2V9P43P7 [34/182] Removal and mounting of operation panel and cover

Tecorp HC2V9G4200 [34/182] Removal and mounting of operation panel and cover
High Performance Vector Control/TorqueControl Inverter User Manual
12 Chapter 2 Inverter Installation
Note:
When the G-20P4G-22P2 and G-47P5/P-4011 and below power class inverters are mounted
side by side in the cabinet, please remove the upper dust guard and the lower leading board.
Fig. 2-2 Mounting direction and space for G-4011/P-4015 and above power class
2.3 Removal and Mounting of Operation Panel and Cover
2.3.1 Removal and Mounting of Operation Panel
Removal of operation panel
As shown in Fig. 2-3, the grab on the operation panel forcefully in direction 1, and then lift the panel
body in direction 2.
Mounting of operation panel
As shown in Fig.2-4, align with the lower clamping position of the operation panel in direction 1, and
then press down the operation panel in direction 2, until the “crack” sound is heard.
Do not mount the operation panel in any other direction; otherwise, the operation panel will have
poor contact.
Above 100mm
Above 100mm
Above 100mm
Above 100mm
Air circulation
position
Air circulation
position
Above 200mm
Above 200mm
Air circulation position
Above 200mm
Air circulation position
Above 200mm

Содержание

Скачать