Qtech QSW-3410-10T-POE-AC [7/29] Test after installation

Qtech QSW-3410-10T-POE-AC [7/29] Test after installation
USER MANUAL
7
Connect the other end to the AC power socket.
Step two: check the power indicator(PWR) on the front panel, if the LED is on, connection
is Successful.
3.3 Test after Installation
Make sure the working voltage is the same with the rated voltage of
switch. Check the connection of grounded cord.
Check the connection of configuration cable and power input cord.
If the interface cable is partly deployed outdoor, please check the connection of anti-
thunder AC power strip and interface anti-thunder device.

Содержание

Скачать