Daikin FXFQ80PVE [52/90] Fxmq40pve

Daikin FXFQ25PVE [52/90] Fxmq40pve
ED39-865 Dimensions
FXMQ-P (R-410A) 51
2
3. Dimensions
FXMQ40PVE
80
3
×
65=195
167
150
700 or less
700
290
650
300
28
26
3
144
2
300 or more
625
1
150
2
×
65=130
Adjustable
(467 or less)
363
300 or less
277
247
4
×
150=600
6
5
(All around)
11
12
232
4
169
14-8 × 12 oblong hole
212
7
Ceilling
Air outlet
49
3 × 150=450
(From the Air outlet)
150
150
215
460
485
12-8 × 12 oblong hole
(All around)
285
Floor surface
(From the Air inlet)
(Note. 4)
2500 or more
(A case without
the ceiling)
Air inlet
(Note. 2)
CASE 2), 3)
Ceiling
B
Inspection hatch
20
Control box
or more
View B-2
Control box
CASE 1)
or less
Control box
200
Inspection hatch
Control box
Ceiling
Fig. A
Inspection hatch 3
1000
View B-1
Control box
Inspection hatch 2
700
or more
700
or more
or more
200
700
or less
or more
Unit
base
or more
300
Inspection hatch 1
(450mm × 450mm)
Air
outlet
Air
inlet
Inspection hatch 1
(450mm × 450mm)
(SAME AS THE INDOOR
UNIT SIZE +300 OR MORE)
(SAME AS THE INDOOR
UNIT SIZE OR MORE)
Notes)1. Location of MANUFACTURE'S LABEL:
Contro box surface
2. Mount the air filter at the suction side.
Select its colorimethod (gravity method)
50% or more.
3. Do not locate things should not be wet
under the indoor unit.
Dews may drop when humidity reaches
over 80%, or a drain gets stuck,or air
filters are not clean.
4. Space for Service Works
1) One inspection hatch (450 × 450) on the control box side
and a space of 300mm or more under the unit. (Fig. A)
2) One inspection hatch (450 × 450) on the control box side
and 2 (two) inspection hatches under the unit. (Arrow
View B-1)
3) 3 (three) inspection hatches under the unit and the
control box. (Arrow View B-2)
According to any one of below 1)~3), secure a space
for service works, such as, checking and maintenance
of control box and drain pumps, etc.
11
Power supply connection
7
Hook
Socket (For maintenance)
Interunit wiring connection
6
Drain pipe connection
3
12
4
φ 12.7 flale connection
ITEM
Control box (Inside)
5
10
PART NAME
M4
VP25 (O. D. φ 32, I. D. φ 25)
VP25 (O. D. φ 32, I. D. φ 25)
For M10
REMARK
Liquid pipe connection
1
O. D. φ 32 (Outlet)
Gas pipe connection
2
Drain hose (Accessory)
Air discharge flange
8
φ 6.4 flale connection
Air suction flange
9
505
8
×
65=520
700 or more
60
631
10
450 or more
(Service space)
700
(Service space)
6
×
65=390
9
59
(Suspention bolt position)
200
or less
245
738 (Suspention bolt position)
8
(All around)
20-φ 4.7 hole
(All around)
26-φ 4.7 hole
Inspection hatch 450 or more
27
Air inletAir
outlet
Ground terminal (Terminal in Control box)
View
3D060160C

Содержание

Скачать