(3) Sweating may occur and result in water leakage. Therefore, make sure to insulate the following 2
places (drain piping and drain sockets that laid indoors).
After drainage is checked, put the attached insulation piping cover (13) referring to Fig. 17, and insulate
the drain hose (1) and the metal clamp (2) with the attached sealing material (Large) (10) referring to
Fig. 18.
8. ELECTRIC WIRING WORK
8-1 GENERAL INSTRUCTIONS
Make certain that all electric wiring work is carried out by qualified personnel according to the applicable
legislation and this installation manual, using a separate dedicated circuit.
Insufficient capacity of the power supply circuit or improper electrical construction may lead to electric
shocks or a fire.
Make sure to install an earth leakage breaker.
Failure to do so may cause electrical shocks and a fire.
Do not turn on the power supply (branch switch, branch overcurrent circuit breaker) until all the works are finished.
Multiple number of indoor units are connected to one outdoor unit. Name each indoor unit as A-unit,
B-unit ….. and the like. When these indoor units are wired to the outdoor unit and the BS unit, always wiring
the indoor unit to the terminal indicated with the same symbol on the terminal block. If the wiring and the
piping are connected to the different indoor units and operated, it will result in malfunction.
Make sure to earth the air conditioner.
Earthing resistance should be according to applicable legislation.
Do not connect the earth wiring to gas or water pipings, lightning conductor or telephone earth wiring.
Gas piping............Ignition or explosion may occur if the gas leaks.
Drain hose (1)
(accessory)
Fig. 17
Sealing material (Large) (10) (accessory)
Make sure to wrap the sealing material (Large) (10)
over the insulation piping cover (13).
Insulation piping cover (13)
(accessory)
Metal clamp (2)
(accessory)
Do not leave clearance
Start wrapping from where the
metal clamp (2) is tightened.
Wrap the sealing material (Large) (10) so that
the metal clamp (2) end side may be doubled.
Metal clamp (2)
(accessory)
Fig. 18
Drain hose (1)
(accessory)
Sealing material (Large) (10)
(accessory)
01_EN_3P249378-7M.fm Page 17 Wednesday, September 12, 2012 1:05 PM