Daikin EHSX04P30A — установка и обслуживание тепловых насосов: руководство по эксплуатации [38/68]
Превью страниц
Страница 38 /
68
![Daikin EHSH04P30A [38/68] Removing the protective cover](/views2/1786267/page38/bg26.png)
Installation and maintenance manual
38
Daikin Altherma EHS(X/H)
Daikin Solar tank with integrated interior heat pump unit
008.1420744 – 06/2015
6 x Service and maintenance
6 Service and maintenance
6.1 General
Regular inspection and maintenance of the Altherma EHS(X/H)
reduces energy consumption and ensures a long life and smooth
operation.
RISK OF ENVIRONMENTAL DAMAGE!
Important information regarding the coolant used.
The complete heat pump system contains refrigerant
with fluorinated greenhouse gases which damage the
environment if released.
Coolant type: R410A
GWP* value: 2087,5
* GWP = Global Warning Potential
● Fill in the total coolant filling quantity on the
supplied label on the heat pump exterior unit (for
information consult the installation instructions for
the heat pump exterior unit).
● N
ever allow coolant to be released into the atmos-
phere - always suction it off and recycle using a
suitable recycling device.
Have the inspection and maintenance carried out by
authorised and trained HVAC engineers once a year,
ideally before the heating period. This can prevent
faults during the heating period.
Daikin recommends an inspection and maintenance
contract to ensure regular inspection and maintenance.
Legal requirements
According to the F-Gases Directive (EC) No. 842/2006 Article 3,
replaced on 01.01.2015 by (EC) No. 517/2014 Articles 3 and 4,
Operators (or Owners) must perform regular maintenance on
their fixed cooling systems, check impermeability and have any
leaks repaired immediately.
All installation, maintenance and repair work on the cooling circuit
must
be documented e.g. in the operating manual.
Operators of Daikin heat pump systems are subject to the fol-
lowing obligations:
The European statutory investigation period applies for
heat pumps from a total system coolant filling quantity
of 3 kg or, as of 01.01.2017 from a total filling quantity
of 5 t CO
2
-equivalent (in the case of R410A from
2.4 kg).
Daikin nonetheless recommends the conclusion of a
maintenance contract, including documentation of the
work carried out in the operating manual in order to pre-
serve the right to guarantee, inc
luding for systems for
which there is not legal obligation to monitor imperme-
ability.
● W
ith a system coolant total filling quantity of 3 kg – 30 kg
or from 6 kg in hermetic systems and from 01.01.2017 with a
total filling quantity of 5-50 t CO
2
-equivalent or from 10 t CO
2
-
equivalent in hermetic systems:
Inspections carried out by certified personnel at intervals
of no more than 12 months and documentation of the
work performed in accordance with valid regulations. This
documentation must be retained for at least 5 years.
Certified people are those who have proof of expertise
for the European Community for work on stationary
refrigeration systems (heat pumps) and air conditioning
systems, according to the F-Gases Directive (EC).
303/2008.
– up to 3 kg coolant fill quantity: Expert certificate
category II
–3 kg coolant fill quantity o
r over: Expert certifi-
cate category I
6.2 Removing the protective cover
Fig. 6-1 Unscrew/loosen screws, lift the cover at the back and remove
in a forwards direction.
6.3 Activities to be performed annually
WARNING!
Improperly carried out work on the Daikin Altherma
EHS(X/H) and its components that have been con-
nected as an option can endanger human life and
heal
th and adversely affect the operation of the these
components.
● Work on the Daikin Altherma EHS(X/H) (such as
maintenance or servicing) is only to be carried out
by persons who are authorised and who have
successfully completed qualifying technical or
vocational training and who have taken part in
advanced training sessions recognised by the
appropriate responsible authorities. These include
in particular certified heating engineers,
qualified electricians and HVAC specialists,
who because of their professional training and
expert knowledge, have experience in the profes-
sional installation and maintenance of heating,
cooling and
air conditioning systems and heat
pumps.
Содержание
257- Indoor unit for air water heat pumps daikin altherma integrated solar unit
- Installation and maintenance manual
- Malfunctions 43
- Tightening torque 63
- Emergency operation 54
- Temporary shutdown 35
- List of keywords 67
- Electrical connection 7
- Technical data 58
- List of contents
- Dimensions and connections 3
- Start up 31
- Laying coolant lines 29
- Design and components
- Set up and installation 13
- Intended use
- Decommissioning 35
- Set up 5
- Instructions for operating safety
- Circuit diagram daikin altherma ehs x h 64
- Service and maintenance 38
- Initial commissioning 31
- Characteristic lines 61
- Safety 4
- Hydraulic system connection 55
- Avoid danger
- Removing the protective cover 38
- General 38
- Activities to be performed annually 38
- Recognising errors correcting malfunctions 42
- Final shutdown 37
- Filling the system with water 30
- Re commissioning 33
- Filling and topping up the storage tank 40
- Product description 7
- Filling and topping up the heating system 41
- Pressure test and filling the coolant circuit 30
- Fault codes 47
- Observing instructions
- Errors malfunctions and messages 42
- Water connection 6
- Notes 65
- Warning signs and explanation of symbols
- Monitoring and configuration dip switch 53
- Equipment data 58
- X safety
- Warning signs and explanation of symbols
- Validity
- Special warning signs
- Safety
- Relevant documents
- Observing instructions
- Meaning of the warnings
- Handling instructions
- Intended use
- Instructions for operating safety
- Electrical installation
- Before working on the hydraulic system
- Avoid danger
- X safety
- X safety
- Working on cooling systems heat pump
- Site of installation
- Requirements for the heating water
- Operation
- Instructing the user owner
- Heating system and sanitary connection
- X product description
- Top of unit
- Product description
- Design and components
- X product description
- Fig 2 2 design and components of the daikin altherma ehs x h p30a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h p30a
- Device external and internal design daikin altherma ehs x h b p30a
- X product description
- Fig 2 3 design and components of the daikin altherma ehs x h b p30a external view and internal design for legend descriptions see tab 2 1
- X product description
- Fig 2 4 design and components of the daikin altherma ehs x h p50a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h p50a
- X product description
- Fig 2 5 design and components of the daikin altherma ehs x h b p50a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h b p50a
- X product description
- X set up and installation
- Set up and installation
- Dimensions and connections
- Daikin altherma ehs x h p30a
- Daikin altherma ehs x h p50a
- X set up and installation
- Scope of delivery
- X set up and installation
- Set up
- X set up and installation
- Water connection
- X set up and installation
- Electrical connection
- Connecting hydraulic lines
- X set up and installation
- Overall connection plan daikin altherma ehs x h
- Fig 3 7 overall connection diagram for electrical connection during device installation
- Explanation of symbols and abbreviations in this chap ter see tab 3 2 and tab 3 3
- The a1p circuit board comes pre connected to the unit no as sembly or connection work is necessary on the a1p circuit board
- Terminal assignment for the rtx ehs circuit board
- Terminal assignment for the rtx al4 circuit board
- Position of the circuit boards
- Connection assignment circuit board a1p
- X set up and installation
- X set up and installation
- Removing the protective cover
- Mains connection daikin altherma ehs x h
- Connection assignment circuit board rocon bm1
- X set up and installation
- Opening the control housing and establishing electrical connections
- Connection of external temperature sensor rocon ot1
- Connection of erlq exterior heat pump unit
- X set up and installation
- External demand signal eds
- Connection of an external switching contact
- Connection variant 2
- Connection variant 1
- Connection of the electrical daikin backup heater ekbuxx
- Connection of an external heat generator
- X set up and installation
- X set up and installation
- Caution
- X set up and installation
- Daikin room station ehs157034
- Daikin mixer module ehs157068
- Connection optional daikin rocon system components
- Connection of the daikin room thermostat
- X set up and installation
- Low tariff mains connection ht nt
- Internet gateway daikin ehs157056
- Connection switch contacts aux outputs
- Connection of the daikin fwxv 15 20 aveb
- C onnection of the daikin fwxv 15 20 aveb
- Symbols and legend keys on connection and circuit diagrams
- Connection intelligent controller smart grid sg
- X set up and installation
- X set up and installation
- X set up and installation
- Laying coolant lines
- X set up and installation
- Pressure test and filling the coolant circuit
- Filling the system with water
- Filling the storage tank
- Filling the hot water heat exchanger
- Filling the heating system
- Checking the water quality and adjusting the pressure gauge
- Start up
- Set the commissioning parameters
- Requirements
- L commissioning
- Initial commissioning
- X start up
- X start up
- Venting the internal heating circulation pump
- Expert
- X start up
- Start up
- Requirements
- Re commissioning
- Configuring screed program parameters only if necessary
- Check minimum flow
- Activating the parameter air purge
- X start up
- Without solar installation
- Temporary shutdown
- Draining the storage tank
- Decommissioning
- X decommissioning
- X decommissioning
- Only for the solar installation
- Draining the heating circuit and hot water circuit
- X decommissioning
- Recommendations for disposal
- Final shutdown
- X service and maintenance
- Service and maintenance
- Removing the protective cover
- Legal requirements
- General
- Activities to be performed annually
- X service and maintenance
- With kfe filling connection or with installed solar system see also chapter 5
- Filling and topping up the storage tank
- X service and maintenance
- Without installed solar system
- X service and maintenance
- Filling and topping up the heating system
- X errors malfunctions and messages
- Troubleshooting
- Recognising errors correcting malfunctions
- Read protocol
- Errors malfunctions and messages
- Current fault display
- X errors malfunctions and messages
- Malfunctions
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- Fault codes
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- Touching live parts can result in an electric shock and lead to potentially fatal injuries and burns
- Pump continuous running off
- No designation factory setting
- Monitoring and configuration dip switch
- Domestic hot water gener ation on
- Do not change off
- Disconnect the system from the power supply open the control housing and remove the rocon bm1 board see chapter 3 check the dip switch setting on the a1p circuit board of the daikin altherma ehs x h adjust where necessary see tab 7 4 the factory preset may only be changed if e g an optional accessory was connected replace the rocon bm1 switch board close the control housing and reconnect the power supply
- Dip switch settings are not recognised until a brief inter ruption to the power supply
- Dip switch
- Before beginning work on live parts disconnect all of the systems circuits from the power supply switch off main switch disconnect fuse and secure against unintentional restart
- X errors malfunctions and messages
- Warning
- X errors malfunctions and messages
- Emergency operation
- X hydraulic system connection
- Hydraulic system connection
- X hydraulic system connection
- X hydraulic system connection
- X technical data
- Technical data
- Equipment data
- Daikin altherma ehs x h p30a
- X technical data
- X technical data
- Daikin altherma ehs x h p50a
- Characteristic lines
- X technical data
- Sensor characteristic lines
- X technical data
- Sensor resistance in ohm
- Sensor output frequency in hz
- Pt 1000
- Measured temperature in c
- Measured flow in l min
- M l min
- Fls sensor flow temperature
- 14 229 hz
- X technical data
- Tightening torque
- Characteristic curves for pumps
- Fig 9 8 circuit diagram daikin altherma ehs x h for legend see tab 3 3
- Circuit diagram daikin altherma ehs x h
- X technical data
- X notes
- X notes
- X list of keywords
- Numerics
- List of keywords
Похожие устройства
-
Daikin EVLQ08CAV3Руководство по применению для установщика -
Daikin EVLQ08CAV3Справочное руководство для монтажника -
Daikin EVLQ08CAV3Общие правила техники безопасности -
Daikin EVLQ08CAV3Инструкция по монтажу -
Daikin EVLQ05CAV3Справочное руководство для монтажника -
Daikin EVLQ05CAV3Руководство по применению для установщика -
Daikin EVLQ05CAV3Общие правила техники безопасности -
Daikin EVLQ05CAV3Инструкция по монтажу -
Daikin EHYKOMB33AA3Справочное руководство для монтажника -
Daikin EHYKOMB33AA3Руководство по применению для установщика -
Daikin EHYKOMB33AA3Руководство по эксплуатации -
Daikin EHYKOMB33AA2Руководство по применению для установщика
Регулярное обслуживание тепловых насосов снижает энергозатраты и продлевает срок службы. Узнайте о важности проверки и соблюдения норм для защиты окружающей среды.