9 x Technical data
Daikin Altherma EHS(X/H)
Daikin Solar tank with integrated interior heat pump unit
008.1420744 – 06/2015
Installation and maintenance manual
61
9.2 Characteristic lines
9.2.1 Sensor characteristic lines
Temperature sensor
Measured temperature in °C
-20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120
Sensor resistance in kOhm according to standard or manufacturer's indications
t
DHW2
NTC
— — 811.5 480.6 293.2 183.8 118.2 77.7 52.3 35.8 25.1 17.8 12.9 9.5 7.1
t
Au
(RoCon OT1),
t
DHW1
NTC
98.66 56.25 33.21 20.24 12.71 8.20 5.42 3.66 2.53 1.78 1.28 0.93 0.69 0.52 0.36
t
Au
(R1T) NTC
197,8 112,0 65,8 40.0 25.0 16.1 10.6 7.2 5.0 3.5 2.5
— — — —
t
V1
, t
V2
, t
V, BH
,
t
R2
NTC
197.80 120.00 65.84 39.91 24.95 16.04 10.58 7.14 4.77 3.19 2.36 1.74 1.33 1.07 0.84
Refrigerant circuit
Number of circuits — 1
Pipe connections
Number — 2
Liquid line
Type — Flanged connection
External Ø inches 1/4" AG 3/8" AG 1/4" AG 3/8" AG
Gas lines
Type — Flanged connection
External Ø inches
5/8" AG
Operating data
Operating range
Flow temperature
for room hea
t-
ing/cooling function
Heating
(min/max)
°C
15 to 55
Cooling
(min/max)
°C 5 to 22
Hot water genera-
tion (with EKBUxx)
Heating
(min/max)
°C 25 to 80
Noise level
Audibility dBA 42 46 42 46
Noise pressure
2)
dBA 28 32 28 32
Electrical data:
Voltage supply
Phases — 1
Voltage V 230
Voltage range V Voltage ±10%
Frequency Hz 50
Mains connection
3)
Exterior heat pump unit for Altherma
EHS(X/H)
—
4G
External unit for heat pump — 3G 3G / 5G 3G 3G / 5G
Optional auxiliary
h
eating
Backup heater
(EKBUxx)
— 3G (1-phase) / 5G (3-phase)
* Not all the equipment mentioned here is offered in some
countries because of the various different country-specific
connection conditions.
1) T
CW
Cold water input temperature = 10 °C
T
DHW
Hot water draw-off temperature = 40 °C
T
S
Storage target temperature (charge state before
drawing off)
2) With a reference spacing of 1 m.
3) Number of individual wires in the conn
ection cable, including protective
earth. The cross-section of the individual lines is dependent on the current
load, the length of the connection cable and the respective legal provi-
sions.
4) Hot water storage tank only to be charged using a heat pump, without a
backup heater
.
Tab.
9-2 Basic data for the Daikin Altherma EHS(X/H)...P50A
Type Daikin Altherma EHS(X/H)
08P50A 16P50A B08P50A B16P50A
Содержание
257- Indoor unit for air water heat pumps daikin altherma integrated solar unit
- Installation and maintenance manual
- Malfunctions 43
- Tightening torque 63
- Emergency operation 54
- Temporary shutdown 35
- List of keywords 67
- Electrical connection 7
- Technical data 58
- List of contents
- Dimensions and connections 3
- Start up 31
- Laying coolant lines 29
- Design and components
- Set up and installation 13
- Intended use
- Decommissioning 35
- Set up 5
- Instructions for operating safety
- Circuit diagram daikin altherma ehs x h 64
- Service and maintenance 38
- Initial commissioning 31
- Characteristic lines 61
- Safety 4
- Hydraulic system connection 55
- Avoid danger
- Removing the protective cover 38
- General 38
- Activities to be performed annually 38
- Recognising errors correcting malfunctions 42
- Final shutdown 37
- Filling the system with water 30
- Re commissioning 33
- Filling and topping up the storage tank 40
- Product description 7
- Filling and topping up the heating system 41
- Pressure test and filling the coolant circuit 30
- Fault codes 47
- Observing instructions
- Errors malfunctions and messages 42
- Water connection 6
- Notes 65
- Warning signs and explanation of symbols
- Monitoring and configuration dip switch 53
- Equipment data 58
- X safety
- Warning signs and explanation of symbols
- Validity
- Special warning signs
- Safety
- Relevant documents
- Observing instructions
- Meaning of the warnings
- Handling instructions
- Intended use
- Instructions for operating safety
- Electrical installation
- Before working on the hydraulic system
- Avoid danger
- X safety
- X safety
- Working on cooling systems heat pump
- Site of installation
- Requirements for the heating water
- Operation
- Instructing the user owner
- Heating system and sanitary connection
- X product description
- Top of unit
- Product description
- Design and components
- X product description
- Fig 2 2 design and components of the daikin altherma ehs x h p30a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h p30a
- Device external and internal design daikin altherma ehs x h b p30a
- X product description
- Fig 2 3 design and components of the daikin altherma ehs x h b p30a external view and internal design for legend descriptions see tab 2 1
- X product description
- Fig 2 4 design and components of the daikin altherma ehs x h p50a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h p50a
- X product description
- Fig 2 5 design and components of the daikin altherma ehs x h b p50a external view and internal design for legend descriptions see tab 2 1
- Device external and internal design daikin altherma ehs x h b p50a
- X product description
- X set up and installation
- Set up and installation
- Dimensions and connections
- Daikin altherma ehs x h p30a
- Daikin altherma ehs x h p50a
- X set up and installation
- Scope of delivery
- X set up and installation
- Set up
- X set up and installation
- Water connection
- X set up and installation
- Electrical connection
- Connecting hydraulic lines
- X set up and installation
- Overall connection plan daikin altherma ehs x h
- Fig 3 7 overall connection diagram for electrical connection during device installation
- Explanation of symbols and abbreviations in this chap ter see tab 3 2 and tab 3 3
- The a1p circuit board comes pre connected to the unit no as sembly or connection work is necessary on the a1p circuit board
- Terminal assignment for the rtx ehs circuit board
- Terminal assignment for the rtx al4 circuit board
- Position of the circuit boards
- Connection assignment circuit board a1p
- X set up and installation
- X set up and installation
- Removing the protective cover
- Mains connection daikin altherma ehs x h
- Connection assignment circuit board rocon bm1
- X set up and installation
- Opening the control housing and establishing electrical connections
- Connection of external temperature sensor rocon ot1
- Connection of erlq exterior heat pump unit
- X set up and installation
- External demand signal eds
- Connection of an external switching contact
- Connection variant 2
- Connection variant 1
- Connection of the electrical daikin backup heater ekbuxx
- Connection of an external heat generator
- X set up and installation
- X set up and installation
- Caution
- X set up and installation
- Daikin room station ehs157034
- Daikin mixer module ehs157068
- Connection optional daikin rocon system components
- Connection of the daikin room thermostat
- X set up and installation
- Low tariff mains connection ht nt
- Internet gateway daikin ehs157056
- Connection switch contacts aux outputs
- Connection of the daikin fwxv 15 20 aveb
- C onnection of the daikin fwxv 15 20 aveb
- Symbols and legend keys on connection and circuit diagrams
- Connection intelligent controller smart grid sg
- X set up and installation
- X set up and installation
- X set up and installation
- Laying coolant lines
- X set up and installation
- Pressure test and filling the coolant circuit
- Filling the system with water
- Filling the storage tank
- Filling the hot water heat exchanger
- Filling the heating system
- Checking the water quality and adjusting the pressure gauge
- Start up
- Set the commissioning parameters
- Requirements
- L commissioning
- Initial commissioning
- X start up
- X start up
- Venting the internal heating circulation pump
- Expert
- X start up
- Start up
- Requirements
- Re commissioning
- Configuring screed program parameters only if necessary
- Check minimum flow
- Activating the parameter air purge
- X start up
- Without solar installation
- Temporary shutdown
- Draining the storage tank
- Decommissioning
- X decommissioning
- X decommissioning
- Only for the solar installation
- Draining the heating circuit and hot water circuit
- X decommissioning
- Recommendations for disposal
- Final shutdown
- X service and maintenance
- Service and maintenance
- Removing the protective cover
- Legal requirements
- General
- Activities to be performed annually
- X service and maintenance
- With kfe filling connection or with installed solar system see also chapter 5
- Filling and topping up the storage tank
- X service and maintenance
- Without installed solar system
- X service and maintenance
- Filling and topping up the heating system
- X errors malfunctions and messages
- Troubleshooting
- Recognising errors correcting malfunctions
- Read protocol
- Errors malfunctions and messages
- Current fault display
- X errors malfunctions and messages
- Malfunctions
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- Fault codes
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- X errors malfunctions and messages
- Touching live parts can result in an electric shock and lead to potentially fatal injuries and burns
- Pump continuous running off
- No designation factory setting
- Monitoring and configuration dip switch
- Domestic hot water gener ation on
- Do not change off
- Disconnect the system from the power supply open the control housing and remove the rocon bm1 board see chapter 3 check the dip switch setting on the a1p circuit board of the daikin altherma ehs x h adjust where necessary see tab 7 4 the factory preset may only be changed if e g an optional accessory was connected replace the rocon bm1 switch board close the control housing and reconnect the power supply
- Dip switch settings are not recognised until a brief inter ruption to the power supply
- Dip switch
- Before beginning work on live parts disconnect all of the systems circuits from the power supply switch off main switch disconnect fuse and secure against unintentional restart
- X errors malfunctions and messages
- Warning
- X errors malfunctions and messages
- Emergency operation
- X hydraulic system connection
- Hydraulic system connection
- X hydraulic system connection
- X hydraulic system connection
- X technical data
- Technical data
- Equipment data
- Daikin altherma ehs x h p30a
- X technical data
- X technical data
- Daikin altherma ehs x h p50a
- Characteristic lines
- X technical data
- Sensor characteristic lines
- X technical data
- Sensor resistance in ohm
- Sensor output frequency in hz
- Pt 1000
- Measured temperature in c
- Measured flow in l min
- M l min
- Fls sensor flow temperature
- 14 229 hz
- X technical data
- Tightening torque
- Characteristic curves for pumps
- Fig 9 8 circuit diagram daikin altherma ehs x h for legend see tab 3 3
- Circuit diagram daikin altherma ehs x h
- X technical data
- X notes
- X notes
- X list of keywords
- Numerics
- List of keywords
Похожие устройства
-
Daikin EVLQ08CAV3Руководство по применению для установщика -
Daikin EVLQ08CAV3Справочное руководство для монтажника -
Daikin EVLQ08CAV3Общие правила техники безопасности -
Daikin EVLQ08CAV3Инструкция по монтажу -
Daikin EVLQ05CAV3Справочное руководство для монтажника -
Daikin EVLQ05CAV3Руководство по применению для установщика -
Daikin EVLQ05CAV3Общие правила техники безопасности -
Daikin EVLQ05CAV3Инструкция по монтажу -
Daikin EHYKOMB33AA3Справочное руководство для монтажника -
Daikin EHYKOMB33AA3Руководство по применению для установщика -
Daikin EHYKOMB33AA3Руководство по эксплуатации -
Daikin EHYKOMB33AA2Руководство по применению для установщика
Изучите технические характеристики и данные по установке систем отопления и охлаждения с интегрированными тепловыми насосами. Подробная информация о работе и обслуживании.