Ada GroundDrill-3 [9/38] Ground drill 3

Ada GroundDrill-3 [9/38] Ground drill 3
MEASUREMENT FOUNDATION
GroundDrill - 3
9
6. Motor
1. PREPARATIONS BEFORE STARTING THE
MOTOR
- Fill tank with fuel. Use a mixture of gasoline and
2-stroke oil. Gasoline to oil mixture ratio is 25:1.
Caution: If you use an incorrect mixture of gaso-
line and oil, the engine may be damaged.
- Throttle cable (pic.6): adjust the cable.
Zipper
Throttle cable adjustment screw
Pic.6
2. START
- Turn main switch to ON (Pic.7)
- Your throttle assembly may not be as shown.
- Pump primer ball on bottom of carburetor about
10 times (Pic.8).
- Move choke lever up for cold starts to block air
ow to carburetor (Pic.9).
- Grasp handle of pull start chord and pull quickly
(Pic.10).
- Move choke lever down as engine warms. If unit
does not start the rst pull, reprime carburetor and
try again.
Throttle lever
Main On/Off switch
Pic.7
Скачать