Karcher HD 13/12-4 ST-H [31/357] High pressure installation

Karcher HD 13/12-4 ST-H [31/357] High pressure installation
English 31
For installation, please follow the specifica-
tions of the VDMA sheet 24416 "High pres-
sure cleaners; fixed high pressure cleaning
systems; concepts, requirements, installa-
tion, testing" (the German version can be
procured from Beuth Verlag, Cologne,
www.beuth.de).
The fixed pipe network and the installion
should be connected with a high pres-
sure line.
The fixed pipe network should be
placed as straight as possible. High
pressure piping systems should be in-
stalled correctly with removable and
fixed clips, taking into consideration the
variation in length caused by the effects
of heat and pressure.
In order to keep pressure losses in the
high pressure piping as small as possi-
ble, we recommend the following:
In regards to the above mentioned standard
values, the length of the pipes and the
number of direction changes and fittings
must be taken into account.
The detergent tank is set up in such a way,
that the bottom of the tank is located not
more than 2 m unter the unit.
High pressure installation
Flow rate Piping Hose lines
600 l/h (10 l/
min)
DN 15 (1/2") DN 8
1,000 l/h
(16.7 l/min)
DN 15 (1/2") DN 8
1,400 l/h
(23.3 l/min)
DN 15 (1/2") DN 8
Install the detergent tank