Tp-Link T1700G-28TQ V2 — установка и управление стековыми гигабитными коммутаторами [13/28]

Превью страниц Страница 13 / 28
Tp-Link T1700G-28TQ V2 [13/28] Power on sequence of the stack switches
JetStream 24-Port Gigabit Stackable Smart Switch with 4 10GE SFP+ Slots
09Installation
Figure 2-4 Stacking Using SFP+ Port
25 26
SFP+
27 28
SFP+ cable
Power On Sequence of the Stack Switches
Since the sequence in which the switches are first powered on might affect the switch
that becomes the stack master, please consider the following guidelines before
powering on the switches in the stack:
1. If you want a particular switch to become the stack master, power on this switch
first. After 1 minute, power on the other switches in the stack. That earliest startup
switch will remain the stack master until the next master re-election.
2. If you have no preference as to which switch becomes the stack master, power on all
the switches in the stack within 1 minute. The switches will participate in a election
to select a master. The Master LED of the selected switch will be on. The switches
powered on after 1 minutes don't participate in the election, and they will become
member switches.
3. You can access to any member of the stack via Web/SSH/Telnet connection, thus to
manage all the switches in the stack.
For more information about stack topology and master election, please refer to "Stack"
chapter in the User Guide on the Resource CD.
Caution:
In the process of using TP-LINK SFP+ Cables, please never bend them into a
radius of 45mm (1.77 inch) or less, because it may permanently damage the SFP+
Cables.

Содержание

88

Узнайте, как правильно установить и управлять стековыми гигабитными коммутаторами. Следуйте рекомендациям по последовательности включения для выбора мастера стека.