SPECK Pumpen IN-VB-S-V 6-50 — guidelines for Safe Transport and Storage of Equipment [65/100]
![SPECK Pumpen IN-VB 40-70-2 F [65/100] Transport and intermediate storage](/views2/1622751/page65/bg41.png)
Transport and intermediate storage
11|2018 EN 15
4 Transport and intermediate storage
4.1 Transport
Check the delivery conditions.
– Check the packaging for transport damage.
– Determine damages and contact the manufacturer and the insurance company.
NOTICE
Damage to the mechanical seal due to improper transportation.
When transporting the pump without the motor, protect the pump shaft from shifting using a
transport lock.
4.2 Lifting the pump
DANGER
Goods being transported can fall and result in death or crushing of limbs!
The lifting hooks on the motor are designed for the weight of the motor. The lifting hooks can break if
the complete pump unit is attached.
Attach the hoisting equipment to both the motor and pump sides if hooks are provided.
Use only hoisting and load-bearing equipment which is suitable, technically sound, and can bear
enough weight.
Never lift or transport the pump/unit using electrical connection cables.
Do not stand under suspended loads.
Only transport the pump/unit in the correct position.
Fig. 4
Fig. 5
Содержание
- In vb in vb s p.1
- Inhaltsverzeichnis p.5
- Glossar p.8
- Umgang mit dieser anleitung p.9
- Mitgeltende dokumente p.9
- Zu diesem dokument p.9
- Zielgruppe p.9
- Unvollständige maschine p.9
- Bestimmungsgemäße verwendung p.10
- Sicherheitsvorschriften p.10
- Sicherheit p.10
- Personalqualifikation p.10
- Schutzeinrichtungen p.11
- Schilder p.11
- Restrisiken p.11
- Bauliche veränderungen und ersatzteile p.11
- Vermeidung von sachschäden p.12
- Störungen p.12
- Beschreibung p.14
- Benennung p.14
- Funktion p.14
- Typenschild p.15
- Ausführung p.15
- Produktinformationen gemäß verordnung 547 2012 für wasserpumpen mit maximaler wellenleistung von 150 kw zur richtlinie 2009 125 eg öko design richtlinie p.16
- Pumpe anheben p.17
- Transport und zwischenlagerung p.17
- Transport p.17
- Rücksendung p.18
- Lagerung p.18
- Rohrleitungen p.19
- Installation p.19
- Einbauort p.19
- Aufstellung p.20
- Elektrischer anschluss p.21
- Drehrichtung prüfen p.21
- Überlastschutzeinrichtung p.22
- Inbetriebnahme außerbetriebnahme p.23
- Inbetriebnahme p.23
- Außerbetriebnahme p.26
- Übersicht p.27
- Störungen p.27
- Wartung während des betriebes p.29
- Wartung instandhaltung p.29
- Schmierung p.29
- Instandhaltungsarbeiten p.29
- Entleeren p.30
- Demontage der pumpe anlage p.30
- Pumpe anlage montieren p.34
- Schraubenanzugsmomente p.36
- Gewährleistung p.37
- Ersatzteile p.37
- Entsorgung p.38
- Maßzeichnung 10 maßzeichnung p.39
- In vb s v p.39
- In vb s f p.39
- In vb s p.39
- 2018 de 37 p.39
- Technische daten p.39
- Technische daten p.40
- De 11 2018 p.40
- Technische daten p.41
- 2018 de 39 p.41
- Technische daten p.42
- De 11 2018 p.42
- Technische daten p.43
- 2018 de 41 p.43
- Technische daten p.44
- De 11 2018 p.44
- Technische daten p.45
- 2018 de 43 p.45
- Schnittzeichnung p.46
- En translation of original operation manual in vb in vb s p.51
- Table of contents p.53
- Glossary p.56
- Using this manual p.57
- Target group p.57
- Other applicable documents p.57
- Incomplete machine p.57
- About this document p.57
- Safety regulations p.58
- Safety p.58
- Personnel qualification p.58
- Intended use p.58
- Structural modifications and spare parts p.59
- Residual risk p.59
- Protective equipment p.59
- Preventing material damage p.60
- Faults p.60
- Description p.62
- Function p.62
- Designation p.62
- Name plate p.63
- Design p.63
- Product information according to 547 2012 for water pumps with a maximum shaft performance of 150 kw for the 2009 125 eg standard eco design guidelines p.64
- Transport and intermediate storage p.65
- Transport p.65
- Lifting the pump p.65
- Storage p.66
- Returns p.66
- Installation p.67
- Installation site p.67
- Installation p.68
- Electrical connection p.69
- Check the direction of rotation p.69
- Current p.70
- Overload protection device p.70
- Commissioning decommissioning p.71
- Commissioning p.71
- Decommissioning p.74
- Overview p.75
- Faults p.75
- Maintenance work p.77
- Maintenance during operation p.77
- Maintenance p.77
- Lubrication p.77
- Draining p.78
- Disassembling of the pump unit p.78
- Assembling pump unit p.82
- Screw tightening torque p.84
- Warranty p.85
- Spare parts p.85
- Disposal p.86
- Technical data p.87
- In vb s v p.87
- In vb s f p.87
- In vb s p.87
- Dimensional drawing 10 dimensional drawing p.87
- 2018 en 37 p.87
- Technical data p.88
- En 11 2018 p.88
- Technical data p.89
- 2018 en 39 p.89
- Technical data p.90
- En 11 2018 p.90
- Technical data p.91
- 2018 en 41 p.91
- En 11 2018 p.92
- Technical data p.92
- Technical data p.93
- 2018 en 43 p.93
- Sectional drawing p.94
- Eg konformitätserklärung p.100
Похожие устройства
-
SPECK Pumpen IN-VB-S-V 6-90Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-90Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-80Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-80Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-70Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-70Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-50Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-40Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-40Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-30Технические характеристики
Learn essential safety measures for transporting and storing equipment. Ensure proper handling to prevent damage and accidents during the process.