SPECK Pumpen IN-VB-S-V 6-50 — правильное обслуживание и разборка насосного оборудования [78/100]
![SPECK Pumpen IN-VB-S 40-90-2 [78/100] Draining](/views2/1622751/page78/bg4e.png)
Maintenance
28 EN 11|2018
8.3.3 Repeat lubrication
1. Clean dirty grease nipples before lubricating them again.
2. Touch the grease gun to the grease nipple.
3. Press the grease into the bearing.
Use 15 g grease per bearing!
8.4 Draining
WARNUNG
Pumped fluid hazardous to health!
Collect and dispose of the pumped fluid properly.
Wear protective clothing if necessary.
In addition the pump must also be neutralised and blow dried with an anhydrous, inert gas if
pumped fluids are used which
– cause corrosion damage when in contact with air humidity.
– ignite when in contact with oxygen.
To drain, remove the plugs from the pump. The plugs can be found in the inlet and outlet areas of the
pump.
The pump must be turned off in order to drain it.
Fig. 11
A Inlet connection Rp ¼ B Outlet connection Rp ¼
8.5 Disassembling of the pump/unit
DANGER
Danger of injury due to insufficient safeguarding.
Turn the pump/unit off correctly.
Close shut-off valves and additional connections.
Drain the pump.
NOTICE
Disassembling various components from the shaft can be difficult following longer operation times.
Either use suitable extractor devices or commercial rust disolvers.
8.5.1 Preparation
1. Switch the pump off and secure it from being switched on again.
2. Reduce the pressure in the pipe system by opening a consumer.
3. Dismantle additional connections.
Содержание
- In vb in vb s p.1
- Inhaltsverzeichnis p.5
- Glossar p.8
- Umgang mit dieser anleitung p.9
- Mitgeltende dokumente p.9
- Zu diesem dokument p.9
- Zielgruppe p.9
- Unvollständige maschine p.9
- Bestimmungsgemäße verwendung p.10
- Sicherheitsvorschriften p.10
- Sicherheit p.10
- Personalqualifikation p.10
- Schutzeinrichtungen p.11
- Schilder p.11
- Restrisiken p.11
- Bauliche veränderungen und ersatzteile p.11
- Vermeidung von sachschäden p.12
- Störungen p.12
- Beschreibung p.14
- Benennung p.14
- Funktion p.14
- Typenschild p.15
- Ausführung p.15
- Produktinformationen gemäß verordnung 547 2012 für wasserpumpen mit maximaler wellenleistung von 150 kw zur richtlinie 2009 125 eg öko design richtlinie p.16
- Pumpe anheben p.17
- Transport und zwischenlagerung p.17
- Transport p.17
- Rücksendung p.18
- Lagerung p.18
- Rohrleitungen p.19
- Installation p.19
- Einbauort p.19
- Aufstellung p.20
- Elektrischer anschluss p.21
- Drehrichtung prüfen p.21
- Überlastschutzeinrichtung p.22
- Inbetriebnahme außerbetriebnahme p.23
- Inbetriebnahme p.23
- Außerbetriebnahme p.26
- Übersicht p.27
- Störungen p.27
- Wartung während des betriebes p.29
- Wartung instandhaltung p.29
- Schmierung p.29
- Instandhaltungsarbeiten p.29
- Entleeren p.30
- Demontage der pumpe anlage p.30
- Pumpe anlage montieren p.34
- Schraubenanzugsmomente p.36
- Gewährleistung p.37
- Ersatzteile p.37
- Entsorgung p.38
- Maßzeichnung 10 maßzeichnung p.39
- In vb s v p.39
- In vb s f p.39
- In vb s p.39
- 2018 de 37 p.39
- Technische daten p.39
- Technische daten p.40
- De 11 2018 p.40
- Technische daten p.41
- 2018 de 39 p.41
- Technische daten p.42
- De 11 2018 p.42
- Technische daten p.43
- 2018 de 41 p.43
- Technische daten p.44
- De 11 2018 p.44
- Technische daten p.45
- 2018 de 43 p.45
- Schnittzeichnung p.46
- En translation of original operation manual in vb in vb s p.51
- Table of contents p.53
- Glossary p.56
- Using this manual p.57
- Target group p.57
- Other applicable documents p.57
- Incomplete machine p.57
- About this document p.57
- Safety regulations p.58
- Safety p.58
- Personnel qualification p.58
- Intended use p.58
- Structural modifications and spare parts p.59
- Residual risk p.59
- Protective equipment p.59
- Preventing material damage p.60
- Faults p.60
- Description p.62
- Function p.62
- Designation p.62
- Name plate p.63
- Design p.63
- Product information according to 547 2012 for water pumps with a maximum shaft performance of 150 kw for the 2009 125 eg standard eco design guidelines p.64
- Transport and intermediate storage p.65
- Transport p.65
- Lifting the pump p.65
- Storage p.66
- Returns p.66
- Installation p.67
- Installation site p.67
- Installation p.68
- Electrical connection p.69
- Check the direction of rotation p.69
- Current p.70
- Overload protection device p.70
- Commissioning decommissioning p.71
- Commissioning p.71
- Decommissioning p.74
- Overview p.75
- Faults p.75
- Maintenance work p.77
- Maintenance during operation p.77
- Maintenance p.77
- Lubrication p.77
- Draining p.78
- Disassembling of the pump unit p.78
- Assembling pump unit p.82
- Screw tightening torque p.84
- Warranty p.85
- Spare parts p.85
- Disposal p.86
- Technical data p.87
- In vb s v p.87
- In vb s f p.87
- In vb s p.87
- Dimensional drawing 10 dimensional drawing p.87
- 2018 en 37 p.87
- Technical data p.88
- En 11 2018 p.88
- Technical data p.89
- 2018 en 39 p.89
- Technical data p.90
- En 11 2018 p.90
- Technical data p.91
- 2018 en 41 p.91
- En 11 2018 p.92
- Technical data p.92
- Technical data p.93
- 2018 en 43 p.93
- Sectional drawing p.94
- Eg konformitätserklärung p.100
Похожие устройства
-
SPECK Pumpen IN-VB-S-V 6-90Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-90Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-80Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-80Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-70Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-70Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-60Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-50Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-40Технические характеристики -
SPECK Pumpen IN-VB-S-V 6-40Инструкция по эксплуатации -
SPECK Pumpen IN-VB-S-V 6-30Технические характеристики
Узнайте, как правильно обслуживать и разбирать насосное оборудование. Следуйте инструкциям по смазке, слива и безопасной разборке для предотвращения травм.