Commissioning Manual ED721208
Commissioning Manual EM11A021
DCM601A51 intelligent Touch Manager
5
2. Engineering
2-1 'PIKPGGTKPI9QTMƃQY
Various engineering works are necessary for using the iTM.
'PIKPGGTKPIYQTMUECPDGTQWIJN[FKXKFGFKPVQVJQUGECTTKGFQWVCVVJGQHƂEGKPCFXCPEGCPFVJQUG
carried out on site after installation.
6JGHQNNQYKPIFKCITCOUJQYUVJGGPIKPGGTKPIYQTMƃQY
New installation (Without using the pre-engineering tool)
#VVJGQHƂEG See:
Prepare various information.
Check the equipment to connect to DIII-NET.
Allocate the Group Address.
Acquire the upgrade data. 4-8 Upgrade
Acquiring the Activation key
* When necessary
5-1 Activation
Acquiring the Activation key
At the site
Install the iTM. Installation Manual (EM11A016)
Install the upgrade data. 4-10 Installation
Make basic settings.
(Boot sequence)
Installation Manual (EM11A016)
Set up “Main” and “Sub”. 4-3 DIII-NET Engineering
Activate optional maker functions.
Enable dealer options.
* When necessary
5-1 Activation
Entering the Activation key
5-2 Dealer Option Setup
Register management points and Layout View.
(Load from CSV or register manually)
4-1 Mgmt. Point Data Regist