Daikin RXYTQ10U7YF [65/152] Unit installation

Daikin RXYTQ10U7YF [65/152] Unit installation
17 | Unit installation
Installer and user reference guide
65
RXYTQ8~16U7YF
VRV IV+ heat pump for high ambient temperatures
4P561157-1A – 2020.10
NOTICE
Prepare a water drainage channel around the foundation to drain waste water
from around the unit. During heating operation and when the outdoor
temperatures are negative, the drained water from the outdoor unit will freeze
up. If the water drainage is not taken care of, the area around the unit might be
very slippery.
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a

Содержание

Похожие устройства

Скачать