Daikin ZH5LMGU [22/58] Continuous capacity control unit disassembly of control motor

Daikin ZH7SLF [22/58] Continuous capacity control unit disassembly of control motor
Si50-402 Overhaul Instructions
Semi-Hermetic Single Screw Compressor Version IV 21
4.2 (Continuous Capacity Control Unit) Disassembly of
Control Motor
1. Check the position of the control motor
Check that the control motor is in its 100% position. (If this motor is not in the 100% position,
it cannot be disassembled.) The following section shows the checking method.
The position of the control motor can be checked on the opening degree indication plate or
according to the position of brass block provided on the side plate of the motor.
Fig. 4-20 Top view of control motor (in the case potentiometer is mounted)
!
Should the control motor not be in its 100% position, pass a rated voltage of the control
motor through each pin, as shown in Table below. (Reference: It takes approximately two
minutes for the motor to move from 0% to 100%. The motor stops at 0% or 100% via a
micro switch.)
Type of compressor Position of brass block at 100%
ZH3G, 5G Around the upper limit
ZH7G, 9G Around the lower limit
Type of compressor Pass 200-V through pins below
ZH3G, 5G Blue to Yellow
ZH7G, 9G Blue to Orange
Black
Orange
Yellow
Blue
Terminal pin
Opening degree
indication plate
Potentiometer
Brass block
White Red