Installation SiEN34-705
60 General Information
(2) After piping work is finished, check drainage flows smoothly.
! Open the water inlet lid, add approximately
1 liter of water gradually and check drainage flow.
[ WHEN ELECTRIC WIRING WORK IS FINISHED ]
! Check drainage flow during COOL running, explained under “TEST OPERATION”.
[ WHEN ELECTRIC WIRING WORK IS NOT FINISHED ]
! Remove the electric parts box lid, connect a
power supply and remote control to the
terminals.
(Refer to the “HOW TO CONNECT
WIRINGS”)
Be sure attach the electric parts box lid
before turning on the power.
Next, press the inspection/ test operation
button “ ” on the remote control. The unit
will engage the test operation mode.
Press the operation mode selector button
” until selecting FAN OPERATION
” . Then, press the ON/OFF button
”. The indoor unit fan and drain pump will start up. Check that the water has drained
from the unit. Press “ ” to go back to the first mode.
! You can check whether drainage is satisfactory or not by removing the access opening lid
and checking the water level of the drain pan through the access opening.
! Be careful when doing so because the fan is turning at the same time.
3P086156-7D
Water inlet
Portable pump
Water inlet lid
Refrigerant pipes
Bucket
Drain outlet for maintenance
(with rubber plug)
Note: Use this outlet to drain water from the drain pan.
«Adding water from
inspection opening»
Open
Close
L N
X Y
NL
Power supply
terminal block
220V – 240V single
phase power supply.
Indoor
PC board
Electric parts box
TEST
TEST

Содержание

Скачать