Daikin FDBG71AVE [44/50] Installation

Daikin FDBG71AVE [44/50] Installation
ED41-015B Installation
FDBG-A Series 43
5 Installation
If the unit drains badly, place
it on concrete blocks.
B
C
A
Leave sufficient space for piping and
electric wiring, or at least enough space to
unscrew and remove the terminal cover.
Over
250
Use a turn-
buckle (on the
side of the
suction grille).
If the outdoor unit
vibrates too much,
adjust the angles of
the legs.
If it seems that the unit may
tilt or fall, stabilize it by
fastening the block band to
the hook or by using a turn-
buckle.
(Anchor bolt
hole pitch)
Units: mm
Units: mm
ABC
R25 · 35 288 470 115
R50 290 530 100
R60 330 540 130
6 Refrigerant Piping Work
For models 71, see the installation manual attached to the outdoor unit.
The outdoor unit is charged with refrigerant.
Put a cap over the open end of the pipe to protect
against dust and moisture.
Avoid bending the pipe as much as possible. If the
pipe must be bent, bend it gently with a radius of
more than 30 to 40 mm.
Selection of copper pipes and heat-insulating materials
When using commercial copper pipes and fittings, observe the following:
Gas pipe
Liquid pipe
Finishing tape
Liquid pipe
O.D. ........... 6.4 mm
Thickness .. 0.8 mm
Insulation dimensions
Insulation material
Polyethylene foam
Heat transfer rate:
0.035 to 0.045 kcal/m h°C
Insulate connecting piping
completely.
The highest temperature of
gas piping became 120°C.
Use the insulator that the
highest temperature can be
resisted.
NOTE) Be sure that both the gas and liquid pipes are insulated according to the above insulation dimensions.
Flaring the pipe end
Use a pipe cutter to
cut the pipe end.
(Cut at exact
right angles.)
Remove burrs.
Put the flare nut on
the pipe.
(Outdoor unit side only)
To the indoor unit.
Do not allow chips
to enter the pipe.
(Attach at the
exact position
shown below.)
Check.
A
Dimension
above the die
Die
Flare.
Make sure that
the flare nut fits
correctly.
The pipe end
must be evenly
flared in a
perfect circle.
Rigid
Imperial
A
0.5 mm 1.0 mm
Refer to Table 1 for the flare dimensions.
Gas pipe insulation
I.D.
Thickness
R25
12 to 15 mm
10 mm
R35
14 to 16 mm
R50 · 60
16 to 20 mm
minimum
Gas pipe
O.D.
Thickness
R25 9.5 mm 0.8 mm
R35 12.7 mm 0.8 mm
R50 · 60
15.9 mm 1.0 mm
Inter-unit wiring
Drain hose
Liquid pipe insulation
I.D. ............ 8 to 10 mm
Thickness .. 10 mm minimum
Be sure to cover with
a cap.
C : 1PN04069-1A-3