CHARGE WARNING LAMP LINE INSPECTION
CAUTION:
If open circuit is detected in L terminal, alternator cannot start generating.
INSPECTION PROCEDURE
1. CHARGE WARNING LAMP INSPECTION
1. Turn ignition switch OFF.
2. Disconnect alternator connector
3. Connect alternator connector terminal 4 to ground.
4. Turn ignition switch ON.
Does charge warning lamp illuminate?
YES >> GO TO 4.
NO >> GO TO 2.
2. CONNECTOR INSPECTION
1. Turn ignition switch OFF.
2. Check meter and terminals (meter side, and harness side) for damage, deformation or improper connec-
tion.
OK or NG
OK >> GO TO 3.
NG >> Repair terminals and connectors.
3. CONTINUITY INSPECTION
1. Disconnect combination meter connector.
2. Check continuity between combination meter connector terminal 38 and ground, and combination meter
connector terminal 38 and alternator connector terminal 4.
OK or NG
OK >> Replace combination meter. (Do not replace alternator, since it is normal.)
NG >> Repair the harnesses or connectors. (Do not replace alternator, since it is normal.)
MKIB1916E
MKIB0555E
38 - Ground : Continuity should not exist.
38 - 4 : Continuity should exist.