Nissan Note — установка и снятие генератора: пошаговая инструкция [40/60]

Nissan Note [40/60] Removal and installation hr engine models
SC-40
CHARGING SYSTEM
8. Loosen alternator lower mounting bolt, and pull out from U-cut
portion on front cover.
9. Remove alternator assembly from engine.
INSTALLATION
Install in the reverse order of removal, taking care of the following point.
Install alternator, and check tension of belt. Refer to EM-14, "Tension Adjustment" .
CAUTION:
Be sure to tighten B terminal mounting nut carefully.
Removal and Installation (HR Engine Models)
BKS000UD
REMOVAL
1. Disconnect battery ground cable.
2. Remove fender protector from RH side.
3. Remove alternator drive belt. Refer to EM-115, "
Removal and Installation" .
4. Remove idler pulley assembly. Refer to EM-116, "
Removal and Installation of Drive Belt Idler Pulley" .
5. Disconnect alternator harness connector.
B terminal mounting nut, ground wire mounting nut, and
remove harness clips.
6. Remove A/C compressor. Refer to ATC-140, "
Removal and Installation of Compressor" (with auto A/C) or
MTC-86, "
Removal and Installation of Compressor" (with manual A/C).
MKIA0078E
B terminal nut:
: 9.32 - 10.8 N·m (0.95 - 1.1 kg-m, 82 - 95 in-lb)
Ground bolt:
:2.94-4.9N·m(0.30-0.49kg-m,26-43in-lb)
Alternator mounting bolt:
: 33.3 - 46.1 m (3.4 - 4.7 kg-m, 24 - 34 ft-lb)
Alternator upper bracket bolt:
: 33.3 - 46.1 m (3.4 - 4.7 kg-m, 24 - 34 ft-lb)
Engine mounting stay bolt:
: 40.0 - 50.0 m (4.1 - 5.1 kg-m, 30 - 37 ft-lb)
Idler pulley bracket bolt:
: 16.6 - 23.5 m (1.7 - 2.4 kg-m, 12 - 17 ft-lb)
Idler pulley nut:
: 25.5 - 33.3 m (2.6 - 3.3 kg-m, 19 - 24 ft-lb)
MKIB1996E

Содержание

Подробная инструкция по снятию и установке генератора. Узнайте, как правильно выполнить все этапы, включая проверку натяжения ремня и затяжку крепежей.

Скачать
Случайные обсуждения