Nissan Note [33/60] Inspection procedure

Nissan Note [33/60] Inspection procedure
CHARGING SYSTEM
SC-33
C
D
E
F
G
H
I
J
L
M
A
B
SC
3. CHARGE WARNING LAMP INSPECTION
1. Set engine speed at 2,500 rpm.
2. Check if charge warning lamp illuminates.
Does charge warning lamp illuminate?
YES >> Go to SC-36, "INSPECTION OF EXCESSIVE ALTER-
NATOR POWER GENERATION" .
NO >> Go to SC-36, "
INSPECTION OF INSUFFICIENT
ALTERNATOR POWER GENERATION" .
CHARGE WARNING LAMP LINE INSPECTION
CAUTION:
If open circuit is detected in L terminal, alternator cannot start generating.
INSPECTION PROCEDURE
1. CHARGE WARNING LAMP INSPECTION
1. Turn ignition switch OFF.
2. Remove alternator connector.
3. Connect alternator connector terminal 3 to ground.
4. Turn ignition switch ON.
Does charge warning lamp illuminate?
YES >> GO TO 4.
NO >> GO TO 2.
2. CONNECTOR INSPECTION
1. Turn ignition switch OFF.
2. Check combination meter and terminals (meter side, and harness side) for damage, deformation or
improper connection.
OK or NG
OK >> GO TO 3.
NG >> Repair terminals and connectors.
MKIB0555E
MKIB1919E
MKIB0555E

Содержание

Скачать
Случайные обсуждения