Daikin CHYHBH05AFV32 [30/56] Operation

Daikin CHYHBH05AFV32 [30/56] Operation
4 | Operation
User reference guide
30
CHYHBH05+08AF + EHYKOMB33AA
Daikin Altherma R Hybrid
4P471762-1B – 2020.10
Setting Description
Use day
schedule
Day schedule used during your holiday.
Example: Saturday
INFORMATION
Switch to Adv. end user if you want to change the Use day schedule setting.
To configure the holiday (when you go away)
Prerequisite: You switched the permission level to Advanced end user.
1 Go to [2.2]: > Holiday > Holiday mode.
2 Select Leave.
3 Configure the holiday mode settings (when you go away).
4 Activate the holiday mode.
Possible holiday mode settings (when you go away)
Setting Description
From and Until First and last day of your holiday.
Operation mode Operation mode used during your holiday.
Heating Setpoint used during your holiday when the unit is
operating in heating mode.
DHW Turn ON or OFF domestic hot water operation during your
holiday.
INFORMATION
You can only change the From and Until settings in the End user level. For
changing the other settings, you have to switch to Adv. end user level.
To activate or deactivate the holiday mode
Prerequisite: You have configured the holiday.
1 Go to [2.1]: > Holiday > Holiday.
2 Do one of the following:
To activate, select Yes and press .
To deactivate, select No and press .
Usage example: You go away during the winter
If you are in the following situation:
In 2days, you go away for 2weeks during the winter.
You want to save energy, but prevent your house from freezing.
Then you can do the following:
Prerequisite: You switched the permission level to Advanced end user.
1 Configure the holiday. Go to [2]: > Holiday, and configure the following
settings:
Setting Value
Holiday mode Away
From 2 February 2014

Содержание

Похожие устройства

Скачать