Daikin EHYKOMB33AA3 [5/44] For the installer
![Daikin EHYKOMB33AA3 [5/44] For the installer](/views2/1798425/page5/bg5.png)
3 General safety precautions
Installation and operation manual
5
EHYKOMB33A
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1K – 2020.10
WARNING: PROTECT AGAINST FROST
Indicates a situation that could result in equipment or
property damage.
WARNING: FLAMMABLE MATERIAL
CAUTION
Indicates a situation that could result in minor or moderate
injury.
NOTICE
Indicates a situation that could result in equipment or
property damage.
INFORMATION
Indicates useful tips or additional information.
Symbols used on the unit:
Symbol Explanation
Before installation, read the installation and
operation manual, and the wiring instruction sheet.
Before performing maintenance and service tasks,
read the service manual.
For more information, see the installer and user
reference guide.
The unit contains rotating parts. Be careful when
servicing or inspecting the unit.
Symbols used in the documentation:
Symbol Explanation
Indicates a figure title or a reference to it.
Example: " 1–3 Figure title" means "Figure 3 in
chapter 1".
Indicates a table title or a reference to it.
Example: " 1–3 Table title" means "Table 3 in
chapter 1".
3.2 For the installer
3.2.1 General
If you are NOT sure how to install or operate the unit, contact your
dealer.
DANGER: RISK OF BURNING/SCALDING
▪ Do NOT touch the refrigerant piping, water piping or
internal parts during and immediately after operation. It
could be too hot or too cold. Give it time to return to
normal temperature. If you must touch it, wear
protective gloves.
▪ Do NOT touch any accidental leaking refrigerant.
WARNING
Improper installation or attachment of equipment or
accessories could result in electrical shock, short-circuit,
leaks, fire or other damage to the equipment. Only use
accessories, optional equipment and spare parts made or
approved by Daikin.
WARNING
Make sure installation, testing and applied materials
comply with applicable legislation (on top of the
instructions described in the Daikin documentation).
CAUTION
Wear adequate personal protective equipment (protective
gloves, safety glasses,…) when installing, maintaining or
servicing the system.
WARNING
Tear apart and throw away plastic packaging bags so that
nobody, especially children, can play with them. Possible
risk: suffocation.
WARNING
Provide adequate measures to prevent that the unit can be
used as a shelter by small animals. Small animals that
make contact with electrical parts can cause malfunctions,
smoke or fire.
CAUTION
Do NOT touch the air inlet or aluminium fins of the unit.
CAUTION
▪ Do NOT place any objects or equipment on top of the
unit.
▪ Do NOT sit, climb or stand on the unit.
NOTICE
Works executed on the outdoor unit are best done under
dry weather conditions to avoid water ingress.
In accordance with the applicable legislation, it might be necessary
to provide a logbook with the product containing at least: information
on maintenance, repair work, results of tests, stand-by periods,…
Also, at least, following information MUST be provided at an
accessible place at the product:
▪ Instructions for shutting down the system in case of an emergency
▪ Name and address of fire department, police and hospital
▪ Name, address and day and night telephone numbers for
obtaining service
In Europe, EN378 provides the necessary guidance for this logbook.
For Swiss market, domestic hot water operation should only be
prepared in combination with a tank. Instant domestic hot water by
the gas boiler is NOT allowed. Make the correct settings as
described in this manual.
Please follow following Swiss regulations and directives:
▪ SVGW-gas principles G1 for gas installations,
▪ SVGW-gas principles L1 for liquid gas installations,
▪ cautional instances regulations (e.g., fire regulation).
3.2.2 Installation site
▪ Provide sufficient space around the unit for servicing and air
circulation.
▪ Make sure the installation site withstands the weight and vibration
of the unit.
▪ Make sure the area is well ventilated. Do NOT block any
ventilation openings.
▪ Make sure the unit is level.
▪ If the wall on which the unit is mounted is flammable, a non-
flammable material must be placed between the wall and the unit.
Do the same for all locations through which the flue piping passes.
▪ ONLY operate the gas boiler if a sufficient supply of combustion
air is ensured. In case of a concentric air/flue gas system
dimensioned according to the specifications of this manual, this is
Содержание
- Daikin altherma hybrid heat pump gas boiler 1
- Ehykomb33aa 1
- Installation and operation manual 1
- Module 1
- Boiler efficiency requirements 92 42 eec 2
- Daikin europe n v 2
- Director 2
- Ehykomb33aa 2
- Electromagnetic compatibility 2014 30 eu 2
- En60335 2 102 2
- Gas appliance regulation 2016 426 eu 2
- Installation and operation manual 2
- Low voltage 2014 35 eu 2
- Ostend 21st of april 2018 2
- P369568 3h 2
- Shigeki morita 2
- About the box 8 3
- About the documentation 4 3
- About the product 3
- About the product 3 3
- About the units and options 9 3
- Benchmark checklist can be used to demonstrate compliance with building regulations and should be provided to the customer for future reference 3
- Benchmark places responsibilities on both manufacturers and installers the purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in accordance with the manufacturer s instructions by competent persons and that it meets the requirements of the appropriate building regulations the 3
- Commissioning 31 3
- Configuration 25 3
- Especially for uk 3
- General safety precautions 4 3
- Glossary 36 3
- Installation 12 3
- Maintenance and service 32 3
- Operation 30 3
- Preparation 11 3
- Table of contents 3
- Technical data 38 3
- The benchmark scheme 3
- Troubleshooting 35 3
- About the documentation 4
- About this document 4
- General safety precautions 4
- Meaning of warnings and symbols 4
- For the installer 5
- General 5
- General safety precautions 5
- Installation site 5
- Electrical 6
- General safety precautions 6
- Gas exhaust 7
- General safety precautions 7
- Local legislation 7
- About the box 8
- Gas boiler 8
- To remove the accessories from the gas boiler 8
- To unpack the gas boiler 8
- About the units and options 9
- Combining units and options 9
- Identification 9
- Identification label gas boiler 9
- Possible options for the gas boiler 9
- About the units and options 10
- Preparation 11
- Preparing the gas boiler installation 11
- Installation 12
- Mounting the gas boiler 12
- Opening the units 12
- To install the gas boiler 12
- To open the gas boiler 12
- To open the switch box cover of the gas boiler 12
- Condensate pipe work 13
- Installation 13
- Internal connections 13
- To install the condensate trap 13
- Condensate pump 14
- Connecting the water piping of the gas boiler 14
- Connecting water piping 14
- External connections 14
- Installation 14
- To connect the water piping for domestic hot water not applicable for switzerland 14
- Connecting the electrical wiring 15
- Flow resistance graph for appliance domestic hot water circuit 15
- Installation 15
- To connect the communication cable between gas boiler and indoor unit 15
- To connect the main power supply of the gas boiler 15
- To connect the water piping for domestic hot water applicable for switzerland 15
- To connect the water piping for space heating 15
- To fill the domestic water circuit of the gas boiler 15
- Connecting the gas piping 16
- Installation 16
- To connect the gas pipe 16
- Connecting the boiler to the flue gas system 17
- Installation 17
- To change the 60 100 concentric connection to a dual pipe connection 17
- To change the gas boiler to 80 125 concentric connection 17
- Appliance categories and pipe lengths 18
- Calculate the total piping length 18
- Installation 18
- Installation 19
- Applicable materials 20
- Installation 20
- Fitting a horizontal flue system 21
- Flue pipe position 21
- Installation 21
- Insulation of the gas exhaust and air intake 21
- Fitting a vertical flue system 22
- Flue gas materials c63 available on the market 22
- Flues in voids 22
- Installation 22
- Plume management kit 22
- About securing the flue system 23
- Installation 23
- 1000 mm 24
- 3 50 mm m 24
- Finishing the gas boiler installation 24
- Installation 24
- To close the gas boiler 24
- Basic configuration 25
- Configuration 25
- Domestic hot water comfort function 25
- Gas boiler 25
- Overview configuration 25
- To install the cover plate 25
- To reset the gas boiler 25
- To turn on off the gas boiler 25
- Configuration 26
- Domestic hot water temperature 26
- Frost protection function 26
- Keep hot function 26
- Maximum space heating supply temperature 26
- To set the parameters via the service code 26
- Configuration 27
- Configuration 28
- Frost protection function 28
- Maximum space heating power setting 28
- To change to a different type of gas 28
- About the co ₂ setting 29
- Configuration 29
- Domestic hot water 30
- Heating 30
- Operation 30
- Operation modes 30
- Overview operation 30
- Commissioning 31
- To perform a gas pressure test 31
- Maintenance and service 32
- Maintenance safety precautions 32
- Opening the gas boiler 32
- To disassemble the gas boiler 32
- To perform a test run on the gas boiler 32
- Maintenance and service 33
- Maintenance and service 34
- To assemble the gas boiler 34
- To clean the inside of the gas boiler 34
- General guidelines 35
- Precautions when troubleshooting 35
- Solving problems based on symptoms 35
- Symptom no space heating by the gas boiler 35
- Symptom the burner does not ignite 35
- Symptom the burner ignites noisily 35
- Symptom the burner resonates 35
- Symptom the power is reduced 35
- Troubleshooting 35
- Error codes of the gas boiler 36
- Error codes overview 36
- Glossary 36
- Solving problems based on error codes 36
- Symptom hot water does not reach the temperature no tank installed 36
- Symptom no domestic hot water 36
- Symptom space heating does not reach the temperature 36
- Glossary 37
- A subset of the latest technical data is available on the regional daikin website publicly accessible the full set of latest technical data is available on the daikin business portal authentication required 38
- Components 38
- Components gas boiler 38
- Technical data 38
- General 39
- Technical data 39
- Technical specifications 39
- Technical specifications gas boiler 39
- Wiring diagram 39
- Wiring diagram gas boiler 39
- Appliance category and supply pressure 40
- Technical data 40
- Technical data 41
- Daikin altherma hybrid heat pump gas boiler module 42
- Ehykomb33a 42
- Gas boiler system commissioning checklist 42
- Installation and operation manual 42
- P353067 1k 2020 0 42
- Technical data 42
- This commissioning checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate building regulations and then handed to the customer to keep for future reference 42
- Ehykomb33a daikin altherma hybrid heat pump gas boiler module 4p353067 1k 2020 0 43
- Installation and operation manual 43
- Service 01 43
- Service 02 43
- Service 03 43
- Service 04 43
- Service 05 43
- Service 06 43
- Service 07 43
- Service 08 43
- Service 09 43
- Service 10 43
- Service record 43
- Technical data 43
Похожие устройства
- Daikin EHYKOMB33AA3 Руководство по применению для установщика
- Daikin EHYKOMB33AA3 Справочное руководство для монтажника
- Daikin EKBALLV1 Инструкция по монтажу
- Daikin EKBPHT04JH Инструкция по монтажу
- Daikin EKDPH008C Инструкция по монтажу
- Daikin EKEPHYHT35H Инструкция по монтажу
- Daikin EKHY3PART Инструкция по монтажу
- Daikin EKHY075787 Инструкция по монтажу
- Daikin EKHY075787 Брошюра
- Daikin EKPS075867 Инструкция по монтажу
- Daikin EKPS075867 Брошюра
- Daikin EKPS075877 Инструкция по монтажу
- Daikin EKPS075877 Брошюра
- Daikin EKPS075917 Инструкция по монтажу
- Daikin EKPS075917 Брошюра
- Daikin EKPS076197 Инструкция по монтажу
- Daikin EKPS076197 Брошюра
- Daikin EKPS076207 Инструкция по монтажу
- Daikin EKPS076207 Брошюра
- Daikin EKPS076217 Инструкция по монтажу