Suzuki GSX-R1100 (1989-1992) [114/358] Disassembly

Содержание

4 11 FUEL AND LUBRICATION SYSTEM DISASSEMBLY For carburetor removal refer to page 3 5 Disassemble the carburetor as shown in the illustration on surface between the beyond the page 4 3 INSPECTION AND ADJUSTMENT NEEDLE VALVE it foreign valve matter seat purmissiblu is caught the and needle valve limits the gasoline mating or if they will are continue worn flowing and cause if to overflow Therefore they should be replaced as a set Conversely if the needle sticks the gasoline will not flow into the float chamber If so clean the float chamber float parts and fuel passage with gasoline FLOAT HEIGHT To check and adjust the float float and height cany out the following clearance between manner Invert the carburetor body Gradually the lower float tongue tongue just lowering from the and the end begins to contact float and hold the the float observe chamber of the it the needle end Then mating of valve needle When valve measure the surface using the stop height vernier calipers 09900 20102 Vernier calipers 200 mm Standard Float height 14 6 1 0 mm 0 5 0 04 in Bend the tongue1 lias necessary to bring the height within not to compress standard range NOIL When measuring the height be sure the needle va ve Spring For any damage or clogging check to see the following Hums Pilot jut Diaphragm Main jet Gasket and O ring Pilot air jet Throttle valve shaft oil seals Main air jet Pilot scruw bleeding hole Needle air jet bleeding holes Float Pilot outlet and bypass holes

Скачать
Случайные обсуждения